Asst Manager (M.E.P) managing integrated facility operations across mechanical, electrical, and plumbing systems, fleet maintenance contractor coordination, and preventive maintenance. Supports asset reliability through documentation, audits, safety checks, and procurement planning for site works. Aligns technical execution with budget control, compliance, and smooth day-to-day operations.

more than 10 years of experience in electrical maintenance, utility management, facility management, HT and LT systems, substations, transformers, DG sets, material handling equipment, fleet maintenance, and industrial operations. Experienced in handling large-scale infrastructure projects, preventive maintenance programs, vendor management, and technical operations.

Overview

1
1
Language
1
1
Certification
11
11
years of professional experience

Work History

Asst Manager (M.E.P)

PRISTINE LOGISTICS LTD.
12.2020 - Current

For facility maintenance capabilities: -

  • high standards of professionalism, integrity, and discretion in managing confidential information.
  • skilled in efficient facilities management – proficient in project management activities, time management, and team leadership.
  • adaptable in fast-paced environments – strong communication and interpersonal abilities.
  • Planned strategy for efficient asset management within facility. Managed and maintained reliability of systems, equipment, properties, and assets.
  • Managed contracts, contractors, and procurement functions to enhance facility budget management.
  • architecture
  • creating comprehensive plans and specifications for mechanical, electrical, and plumbing systems on site
  • Directed activities for contracted facility services encompassing technical reviews, materials, equipment, and products.
  • Facilitated completion of tenders and management of assigned projects for contractors on behalf of facility project managers.
  • documented various contracts for distribution as tenders to contractors for pr/po/boq process.
  • Assessed potential costs of equipment and machinery essential for project completion for facility project managers.
  • Investigated potential development areas in project alignment with established objectives.
  • adherence to compliance standards:
  • document consumption of electricity, water, and fuel; STP operation, earth pit inspection, fire-related equipment, and AMCS.
  • ensuring all MEP systems comply with local building codes and regulations.
  • cost-saving apex and capex based on internal and external audits for center as per technical specifications and estimations.
  • process-focused approach utilized-
  • manager and consistently enforce team adherence to operational service procedures.

Setup and upkeep:

  • Installed, maintained, and repaired MEP systems to ensure optimal functionality
  • Executed cabling projects, ensuring adherence to industry standards and safety protocols. Coordinated vendor operations and maintenance for optimal service delivery. Managed electrical works, including installations and troubleshooting of systems. Oversaw mechanical works related to HVAC systems for enhanced performance. Designed electrical wiring layouts to meet project specifications and regulations. Conducted plumbing installation and repair tasks to support infrastructure needs. Collaborated with cross-functional teams to align project goals and timelines.
  • Oversaw and sustained integrated facilities to fulfill site requirements efficiently.
  • To maintain the proper documentation based on the daily, weekly, and monthly and Reporting to the senior management.
  • silo electrical infrastructure maintenance
  • repairing and maintaining electrical assets (high-mast panels, transformer high-tension panels, internal illumination systems, AC units, distribution boards, cables, etc.)
  • Conducted examinations and surveys on fitting processes with Indian Railway staff. Collaborated with Indian Railway personnel to assess fitting standards and compliance. Analyzed data from fitting inspections to identify areas for improvement. Developed reports based on findings to enhance operational efficiency within Indian Railways.
  • Maintenance of transformers, substations, VCBs, DG sets, HT and LT panels.
  • air screw kcx4 kcx3 compressor scheduled service and maintenance tasks.
  • rail-in-motion road weighbridge optimal upkeep.
  • Supervision of reach stackers, forklifts, hydras, tractors, and Heavy commercial vehicles.

Safety: -

  • Maintained safe working environment through strict adherence to safety standards in all operations.
  • Supervised daily operations, ensuring compliance with safety regulations and operational standards.
  • Implemented training programs for new staff, enhancing team performance and knowledge retention.
  • Monitored inventory levels, conducting regular audits to maintain accuracy and availability of supplies.
  • Developed strategic initiatives to improve customer service response times and satisfaction rates.
  • Evaluated performance metrics pinpointing areas for operational enhancement and cost-saving strategies.
  • Oversaw daily operations to achieve performance quality and service expectations.

Material cum Quality Engineer (MCQE)

AECOM (URS Scott Wilson India Pvt. Ltd.)
01.2018 - 12.2020
  • CONSTRUCTION OF ELECTRICAL LINE OF DISTRIBUTION PROJECT
  • Operation & maintenance of Sub-transmission and Distribution system element, erection, Commissioning and Testing of Power system
  • Supervision of erection of LT & HT lines with poles and drawings.
  • Erection of distribution Transformers of 100, 63, 25, KVA Ratings.
  • Preparation of single line diagram of poles and stringing of 33, 11 KV and LT Line drawings.
  • Preparation of single line diagram of poles.
  • Material management.
  • Prepared reports including DPR, material consumption, material reconciliation for contractors, BOQ, and contractor bills.
  • Guided site supervisors and sub-contractors to ensure quality and timely project completion.
  • Dealing with client & consultant engineers for Inspections at site.
  • Coordination with contractors to finish the job within the schedule time.
  • Coordination with client.
  • Preparation of Reports like DPR, Material Consumption, Material Reconciliation of Contractors, BOQ, contractors Bill. etc.
  • Managed manpower and resources effectively to achieve project deliverables.
  • Preparation of Agriculture Camp consumer list.
  • Survey of new RE Project.
  • Managing skill for managing manpower and available resources in order to provide desired output.
  • Possess good analytical and planning skills with abilities in leading and training.
  • Organization : AECOM (URS Scott Wilson India Pvt. Ltd.)
  • Designation : Material cum Quality Engineer (MCQE)
  • Duration : JAN 2018 to DEC 2020
  • Location : NBDCL KHAGARIA (BIHAR)
  • Project : DDUGJY

ELECTRICAL SUPERVISOR

JYOTI POWER CORPORATION LIMITED
09.2015 - 12.2017
  • Created work plan schedule to fulfill orders according to order data sheet and planning list.
  • Coordinated with project team and vendors from project inception to ensure timely project completion and seamless handover with accurate documentation.
  • Created single line diagrams for poles and stringing of 33, 11 KV and LT line drawings to support project execution.
  • Organization : JYOTI POWER CORPORATION LIMITED
  • Designation : ELECTRICAL SUPERVISOR
  • Project : B.R.G.F
  • Duration : 15th Sept 2015 to 20th Dec 2017.
  • Location : Khagaria (Bihar)

Education

B.E. - Electrical & Electronics

Trinity Institute of technology& Research
01-2015

Skills

MS Excel

MS Office

Basic Auto CAD drawing and 2-D drafting

BOQ preparation

Technical report preparation

MEP systems maintenance

Preventive maintenance planning

Contractor coordination

Asset management

Safety compliance

Certification

Four weeks (28 days) Industrial training on “BHARAT HEAVY ELECTRICAL LIMITED”. A Unit of Bhopal M.P

Interests

Electrical Projects

Timeline

Asst Manager (M.E.P)

PRISTINE LOGISTICS LTD.
12.2020 - Current

Material cum Quality Engineer (MCQE)

AECOM (URS Scott Wilson India Pvt. Ltd.)
01.2018 - 12.2020

ELECTRICAL SUPERVISOR

JYOTI POWER CORPORATION LIMITED
09.2015 - 12.2017

B.E. - Electrical & Electronics

Trinity Institute of technology& Research

Declaration

I hereby declare that the above particulars are true to the best of my knowledge.
Sameer Kumar SoravM.E.P Engineer