Dynamic MEP Head with extensive experience at International Projects, excelling in project management and building systems integration. Proven track record in quality assurance and cost estimation, leading teams to deliver high-rise and commercial projects on time. Strong communicator and problem solver, committed to regulatory compliance and client satisfaction.

Overview

16
16
years of professional experience

Work History

MEP Head

Goyal Realty
Mumbai
02.2025 - Current

Goyal Realty

Working as MEP Head

Design Development with Architect, Lisiaoning design and approval coordination, Estimation and Contract finalization. Site coordination, Billing and commissioning. Handover and Post Hand over Services.

MEP Head

UK Realty
Mumbai
12.2023 - 09.2024
  • Working as MEP Head
  • Project coordination with Architect, Design architect consultant, All MEP Vendors, Site Civil team, Bill checking, Quality, Procurement backups, Estimation, Planning

Consultant

Freelance Consultancy
01.2020 - 11.2023
  • Working as a freelance Consultant with various Developers, PMC, Builders and Contractors on Various MEP Related issues
  • (To some clients still providing service on required basis Like Options Developers, Ornate Developer, PMC Developers, RKS Construction (RANCHI), AK Construction (Varanasi), Gopi Krishna Infrastructure pvt ltd (Hyderabad), Nitson & Amitson (Kolkata) etc

Sr. Manager of MEP and Head of the Dept.

A & O REALTY
Bandra
01.2013 - 12.2020
  • Company Overview: Our Firm is Working as a Developer and Builder
  • We are generally do SRA, Re-Development, High-rise, Commercial Projects
  • Discuss about the final Municipal plan provision with liosioning Architect
  • Making MOEF Drawing with my Team
  • Submitting to MOEF BMC appointed liosioning Person
  • Provisional CFO check
  • If any rectification can happen in CFO, Rectify those with liosioning team
  • Designing with underground tanks(fire, domestic, flushing), drainage, sewage with water calculation
  • Rain water harvesting planning with bore well if applicable
  • Overhead tanks Swimming pool Water load on construction(for structural)
  • Site co-ordination plan
  • With Sub-station, Meter rooms, LV and HV Cable trench, DG Location, SWD, Firefighting piping, Domestic and flushing tank piping
  • Catch pits connection, Manhole Connections etc
  • Typical and Design on Working drawing preparation on Fire alarm and fighting, Electrical, Plumbing, Elevator, Stack parking, Car lift.(if applicable then) Central HVAC.CCTV,EPBAX, Video door phone with intercom system
  • BMS, Inverter system
  • BOQ making for individual system with team
  • Asking for Quotation from different agencies
  • Rate analysis on each matter and a Proper Updated Estimation
  • Vendors finalization With Ethical Contract and terms
  • Design “GFC” Issue at Site and Co-Ordinate with Site Managers
  • Make them Understand the total design through site meeting and Frequent Site Visit
  • Any site related working Solution on execution basis
  • Proper R & D on each Equipment and Device which will install at respective site with proper specification and need
  • Co-Ordinate with Procurement Team for the proper material purchase on round clock basis and rate finalization
  • Update all the Agencies work update on Anytime basis
  • Weekly every Site Visit
  • For URGENT basis also Site Visit
  • All Liosioning Temporary service related problems and Co-ordination with Team and Liosioning team
  • Pre-Surveillance Check all the Device With Safety, Standard of Installation and Maximum Operation basis
  • Final Commissioning of all System with integration with Team and the Vendors
  • With the procedure of CFO,PWD COMPILENCE in various Stream (Electrical, Firefighting)
  • Site beautification lux luminance Designing
  • Compliance of NOC on each System and Push the Project for OC With the co-ordination of Liosioning Team
  • Co-Ordination with Management, Co-Ordinate With Vendors ,Manage with our stipulated Date and Time
  • Audit on Each Interim Bill and Final Bill with specification
  • Our Firm is Working as a Developer and Builder
  • We are generally do SRA, Re-Development, High-rise, Commercial Projects
  • Contact:- Mr
  • Dilip Pitkar 9769330809

MEP Electrical Engineer

DELTA TECHS CONSTRUCTION PVT.LTD
Mumbai
01.2012 - 12.2013
  • Working as a MEP Electrical Engineer, appointed as a Project Engineer in Mumbai, Maharashtra
  • Consulting with the designing part of the house building service provision work, and as well as all site execution work with standard and safety
  • Presently working at 22th floor building at the Chembur East related to House Electrical service, Plumbing, Fire fighting, HT Power, Lift Etc
  • Tendering with estimation and make Project BOQ as per client requirement and Co ordinate Architectural Drawing with Architect
  • Planning of Execution of All MEP Related work as per requirement for time being
  • Co-ordination with Civil work and Planning engineer
  • Final opening of Tender price for selecting Contractor
  • Meeting with Contractor for the project finish date and every action of project with Daily project Target
  • Overall Observation on Project On Standard of Work and Finishing and Project Safety
  • Daily Progress Report making and check overall tally with Project Planning Data
  • Inspection of every subject of execution as per project standard
  • Final Bill check from the contractor
  • All kind meeting between client site and PMC management handling
  • Systematic Administration of Site Handling
  • MEP Project Solution
  • Reference Contact:- Mr
  • Uday Metkar(Director) 09820791804

Asst. Project Engineer

SIMPLEX INFRA.LTD
Bangalore
01.2011 - 12.2012
  • Appointed as a MEP Engineer for three Building
  • 1
  • Residential:- 60 floor +3 basement
  • 2
  • Commercial:- 30 floor +3 basement
  • 3
  • Maleswaram Metro Station with 3 basement of Power house and office building
  • Checking Drawing as per project concern
  • Get issue certificate from client and PMC for the drawing
  • Final opening of Tender price for selecting Contractor
  • As per standard and design and calculation finding out Material
  • Daily Progress Report making
  • Checking overall Civil Site related Site Electrical work and Civil Work Related Mechanical Work
  • Diesel Generator Maintenance
  • Stray current and Building Earthing Related Work (as per BMRCL Standard) and inspection with BMRCL Engineer
  • Final Bill check from the contractor
  • Reference Contact:- Mr
  • Ravi Kumar Orgunti(CPM) 09743793985

Commissioning Engineer

AREVA
01.2010 - 12.2011
  • Commissioning four sub-station on heating ventilation and air condition
  • Working in very tight scale, commissioning with consultant (Lehmayer- German) and Kahramaa (Qatar Govt) clearing the punch list given by the consultant
  • All AREVA LV panels, main distribution board, distribution board, emergency distribution board and their relay panels from emergency inverter and mains (110V DC), heating ventilation and air conditioning control panel
  • Mains and distribution board are simply made by the usual RCB and ELCB as per requirement and design format
  • Control panels are mainly designed on some logic format, and depend mainly on some auxiliary contact and relay contact with some bunch of sensor system
  • Fire alarm system control panel which connected with smoke detector which is basically sensor microprocessor based, connected in series connection with some firebell, and some manual pull station
  • All pumps…..lift pump, jockey pump, diesel pump, electrical pump and building service sump pump connections, attachment with control panels and interconnection with other service of building and alarm and fire alarm system

Project Engineer

AL ARAB TRAD & CONTRACTING
01.2010 - 12.2011
  • Final installation of equipment in all project and pre-commissioning the mechanism
  • As per specification and as per surveillance inspection comment, execution the job
  • Make ready for inspection for the consultant and main contractor
  • All AREVA LV panels, main distribution board, distribution board, emergency distribution board and their relay panels from emergency inverter and mains (110V DC), heating ventilation and air conditioning control panel
  • Mains and distribution board are simply made by the usual RCB and ELCB as per requirement and design format
  • Control panels are mainly designed on some logic format, and depend mainly on some auxiliary contact and relay contact with some bunch of sensor system
  • Fire alarm system control panel which connected with smoke detector which is basically sensor microprocessor based, connected in series connection with some firebell, and some manual pull station
  • All pumps…..lift pump, jockey pump, diesel pump, electrical pump and building service sump pump connections, attachment with control panels and interconnection with other service of building and alarm and fire alarm system

Site Manager

Al ARAB TRAD AND CONSTRUCTION
Doha
01.2009 - 12.2010
  • Doha Super which is 220-MVA sub-station (Qatar) which is energized and working successfully
  • As per need procurement, design approval, document control, health and safety, budgeting, and all administrative level of work in stiff time scale
  • All the building equipment….main distribution board, distribution board, pumps and all control panel interconnection with the system, execution to pre-commissioning
  • Then its final commissioning
  • NB: THIS SUB-STATION IS STILL A QUICKEST ENERZIZED SUB-STATION IN DOHA/QATAR

Site Engineer

01.2009 - 12.2009
  • To schedule with the site personality, meeting with client and consultant regarding technical, commercial aspects etc
  • To do necessary planning & scheduling for finishing the project in time & with limited resources
  • Designing, preparation of shop drawing, As Built DRAWING etc
  • Job involved in lighting, power, fire alarm, CCTV etc
  • In Pearl Qatar - Tower 10B, (P4+Mezzanine+Aminity)

Education

B-TECH - electrical

APPLIED ELECTRONICS AND INSTRUMENTATION
01.2008

HIGHER SECONDARY - SCIENCE

PASSED HIGHER SECONDARY
01.2004

Skills

  • Project management
  • MEP design coordination
  • Building systems integration
  • Quality assurance
  • Cost estimation
  • Vendor management
  • Regulatory compliance
  • Technical documentation
  • Site supervision
  • Risk assessment
  • Effective communication
  • Problem solving
  • Team leadership
  • Client relations
  • Procurement strategies
  • Building codes compliance
  • Contract administration
  • Green building practices
  • Project budgeting
  • Production planning
  • Team collaboration
  • Project scheduling
  • Requirements anticipation
  • Emergency assistance
  • Plan modifications and takeoffs
  • Problem-solving
  • Goal setting
  • Safety management
  • Decision-making
  • Cost control
  • Design and planning

Personal Information

  • Date of Birth: 06/25/84
  • Marital Status: Married

Professional Development

  • LOA Holder (Qatar Govt), On Building HVAC & Electrical System, 01/01/10
  • B-Tech, Applied Electronics and Instrumentation (Electrical), 1/08/08
  • Higher Secondary, Passed Higher Secondary (Science), 01/07/04

Area Of Expertise

  • Project Management
  • Site Management
  • Financial Control
  • Business Development
  • Continuous Improvement
  • Demand Fulfilling
  • Procurement
  • Risk/Vability Assessment
  • Health & Safety
  • Frequent Budgeting
  • Identify Client Needs
  • On Time Delivery
  • Cost Control
  • Man Management
  • Maintaining Partnership
  • Technical Solution

Timeline

MEP Head

Goyal Realty
02.2025 - Current

MEP Head

UK Realty
12.2023 - 09.2024

Consultant

Freelance Consultancy
01.2020 - 11.2023

Sr. Manager of MEP and Head of the Dept.

A & O REALTY
01.2013 - 12.2020

MEP Electrical Engineer

DELTA TECHS CONSTRUCTION PVT.LTD
01.2012 - 12.2013

Asst. Project Engineer

SIMPLEX INFRA.LTD
01.2011 - 12.2012

Commissioning Engineer

AREVA
01.2010 - 12.2011

Project Engineer

AL ARAB TRAD & CONTRACTING
01.2010 - 12.2011

Site Manager

Al ARAB TRAD AND CONSTRUCTION
01.2009 - 12.2010

Site Engineer

01.2009 - 12.2009

B-TECH - electrical

APPLIED ELECTRONICS AND INSTRUMENTATION

HIGHER SECONDARY - SCIENCE

PASSED HIGHER SECONDARY