Profile Snapshot:
I’m confident that my 15+ year of proven track record of excellent work ethic, unparalleled attention to details and knack for IT management will make me an asset at your company and allow me to contribute the team’s success.
Core Result Area:
Important Projects Handled:
Sun pharmaceutical is spread across 100 countries globally with its strong presence in countries
like USA, Canada, Israel etc. IT Infrastructure Operations Current job profile is to handle team of 60+ IT engineers
including Service desk engineers, Team leads, GSD manager, GSD quality & MIS managers, etc in order support
these Global locations from Mumbai. This includes:
• Governance of Global service desk
• End user co-ordination for requirement gathering & fulfilment.
• ITSM call reviews & Systematic improvement plan deployment
• Work from Home enablement
• Deployment of Laptops, desktops, printers etc. at H.O., R&D, plant locations of Sun Pharma
• Ensuring Governance through Asset Management, Vendor management, Budget Management
• Patch deployments, AV deployment & upgrades
• Mobility management through Mass 360
Digital Asset Management
Summary: Zee aims structure the content (approx. 27 PB) with features such as easy navigation, real time
conversion of low raise & high raise files etc. I lead Infrastructure side which includes deliverables such as:
• Evaluation of third party Data Center as per business requirement
• Evaluation of Managed Service provider as per IT requirement
• Carrying out budgetary analysis and helping commercial team for negotiations
• Carrying out microplanning which involves floor layout @ DCs, rack layout @ DCs, HLD & LLD of Servers, storage
& network, RAID partitioning, IP schema etc.,
Corporate IT Infrastructure:
Summary: Corporate IT provides application access tend users for their various business needs. This includes access
broadcast management system (BMS), sales portal, HR & Admin portal etc. I lead Infrastructure side which includes
deliverables such as: Asset tracking with help of Tool
• Facilitating Audits (Internal & external)
• Licenses consolidation (Adobe, MS etc.)
• End user management initiatives
End user management:
Management of outsourced staff for providing helpdesk (desktop/laptop etc.) support for end users.
• Asset tracking & refresh
• Rate negotiations & finalization of vendor
• Tool implementation & update
• End user co-ordination for requirement gathering & fulfillment.
• Setting up procedures & policies streamline deliverables.
Projects Handled:
• Godrej one building unified communication systems deployment for 1200+ users.
• Kaseya asset management tool deployment PAN India for group of companies.
• Back up strategy enrollment through Avamar.
End user management:
• New branch roll out related requirement fulfillment w.r.t IT Infrastructure
Network Administration
• Providing SFTP access, VPN creation, LAN troubleshooting, Firewall rule base management.
• Resolving domain related issues at VSAT based locations.
• Configured broadband technically not feasible (TNF) locations.
• Link budget provisioning/maintaining CAPEX/P.O. raising/Vendor management :
• Decision making achieve cost efficiency & reliability in liaison with various service providers.
• Raising Purchase orders for service providers & vendors & cater SLA related requirements for the same.
Projects Handled:
• Router Refresh Project:
• Some of the KLI locations had 1700 series Cisco routers where out of sales & out of support.
• With negotiations with different vendors (Wipro, Data craft, Sify, HCL, S K International) succeeded in purchasing
new 19000 series routers (get replaced with those of 1700 series) with minimum cost from Cisco& also ensured 3
yr. AMC along with it inclusive of delivery tithe sites.
• Router AMC Project:
• Built up database for inventory of all networking devices (Live as well as spare assets).
• Gathered AMC details (Expired/in AMC/out of support) from Cisco through its channel partners.
• User Movement Activity:
• Provided seamless network support for the user movement from Sion Goregaon (450 in no’s)
• Successful planning & execution of Investment team movement from Sion kalian (taken care of network security
by placing SSG-20 Juniper Firewall, 2 point point links of 10 Mbps each for catering Investment team
applications’ load etc.)
• Provided seamless network support for the user movement from Goregaon 5th Floor t7th Floor (250 in no’s)
Projects Handled:
Kandivali Hub Set-up:
• Project lay out design, set up & implementation for providing connectivity t1000+ users operating out of hub
location of ICICI Prudential @ Kandivali location.
• Purchasing required hardware (Switches/Routers), negotiating with service providers for cost optimization, cocoordinating
with various technical teams implement designed set up in specified TAT.
• Configurations of VLANs with help of technical team as a business requirement. Providing end tend solutions as
per business requirement.
Global Positioning Systems installations for MUMBAI POLICE
• Configuration of Cisco routers for intranet configuration between police control rooms.
• Maintenance & troubleshooting of routers & switches cater SLA requirements.
• Liaison with service provider cater uptime related requirements.
Broadband connectivity at Mumbai Police Locations
• Configured ADSL 502 T D-Link routers various police locations such as police stations, ACP/DCP/Additional CP/
Joint CP offices.
• Provided 24 * 7 support locations which are connected via broadband connectivity
Project Management
Current CTC: 26.5L
Expected CTC: As per company guidelines
DOB: 24 July 1982
Hobbies: Music, Motorcycle rides