Project Management Professional experienced in delivering large-scale EPC projects within petrochemical, steel, alumina, and other non-ferrous industries. Led execution and planning activities for a 1 MTPA Green PVC Project, optimising resources and coordinating procurement, construction, and scheduling. Holds B.Tech in Engineering Technology from BITS Pilani and is pursuing Project Management Professional certification.

Overview

1
1
Certification
16
16
years of professional experience

Work History

Execution Lead (Deputy Manager)

Adani Infra (India) Limited
Mundra, Gujarat
12.2024 - Current
  • Defined project scope, objectives and deliverables to align with management goals.
  • Prepared detailed project plans, timelines, and milestone tracking for smooth execution.
  • Coordinated contractor agencies to facilitate seamless project execution and align with overall objectives.
  • Led structural work execution at the VCM (Vinyl Chloride Monomer) Unit for the Green PVC Project.
  • Executed modular structure erection to minimize sequential time and accelerate project delivery.
  • Assigned tasks according to team expertise, provided guidance, and ensured target achievement.
  • Maintained effective communication across teams and stakeholders to ensure project transparency and collaboration.
  • Proactively identified risks and implemented mitigation strategies to ensure project continuity.
  • Ensured availability of project materials (Matching structural steel and fasteners) to achieve monthly targets.
  • Planned and mobilized resources (manpower and machinery) according to the master schedule.
  • Monitored and planned for the achievement of management-set project milestones.
  • Resolved challenges and bottlenecks to enhance efficiency and sustain project momentum.

Execution In charge (Asst. Manager)

Larsen and Toubro Limited
Hazira, Gujarat
01.2023 - 12.2024
  • Ensured on-time project completion while maintaining zero accidents and adhering to quality standards.
  • Enforce strict adherence to safety standards to achieve a zero accident work environment.
  • Prepared and implemented work permits, work procedures, and risk assessments for safe execution.
  • Conduct risk assessments, safety audits and toolbox talks to maintain compliance.
  • Managed area development, erection planning, and equipment alignment to ensure adherence to project schedules.
  • Led the erection, alignment, and commissioning of the caster and secondary metallurgical bay for the 6 MTPA steel melting plant (SMP) project.
  • Ensure smooth coordination between engineering, procurement and site execution teams.
  • Coordinated with fabrication, site teams, and clients to achieve daily progress targets.
  • Developed and monitored monthly, weekly, and daily work plans to enhance workflow and operational efficiency.
  • Ensure availability of manpower, equipment and materials as per project schedule.
  • Manage subcontractor and vendors for seamless job execution.

Execution In charge (Asst. Manager)

Larsen and Toubro Limited
Lanjigarh, Odisha
10.2021 - 01.2023
  • Executed the dismantling, refurbishment, erection, alignment, and commissioning tasks for the red mud filter unit project at a 6 MTPA alumina refinery.
  • Testing and commissioning of red mud filter unit.
  • Erected and aligned pipe rack structures, pipelines, and equipment to meet project specifications.
  • Dismantled and refurbished pipe rack structures, pipelines, and equipment to ensure project readiness.
  • Estimated work quantities and secured client approvals for project execution.
  • Planned resource allocation to maximise efficiency.

Senior Engineer

Larsen and Toubro Limited
Dolvi, Maharashtra
09.2016 - 10.2021
  • Managed end-to-end responsibility from structural fabrication to equipment erection and commissioning, ensuring quality control and comprehensive documentation throughout.
  • Led the erection, alignment, and commissioning of the By Product Plant (BPP) and Coke Oven Battery (COB) for the 3 MTPA coke oven project.
  • Completed erection and commissioning of the Coke Oven Battery and By-Product Plant within the scheduled time frame, maintaining quality and safety compliance.
  • Led installation and commissioning of key by-product systems such as Scrubber, Primary Gas Cooling (PGC), Ammonium Liquor System (ALS), Storage Tanks, Sulphur Recovery Unit (SRU), Benzol recovery unit, Recirculating Water Pump House (RCPH), process unit pump house, Cooling Tower (CT), Chiller Unit.
  • Supervised installation, alignment, and commissioning of de-dusting units, quenching tower systems, CO and BF gas ducts, oven top and cellar piping for the Coke Oven Battery.
  • Executed structural works for COB and BPP units, including temporary shed, pipe rack structures, substation buildings, exhaust gas unit, and pump houses, ensuring compliance with project specifications.
  • Managed project execution, operations, manpower mobilisation, planning and scheduling to optimise productivity.
  • Ensured strict adherence to project timelines, quality standards and zero-accident safety culture.
  • Coordinated with client (JSW Steel) and technology supplier (ACRE) to enable seamless execution and alignment on technical requirements, enhancing collaboration and project flow.
  • Prepared work permits, Safe Work Procedure (SWP), Job Safety Analysis (JSA) and Hazard Identification and Risk Assessment (HIRA) to ensure safe work execution.

Execution and commissioning Engineer

Larsen and Toubro Limited
Jajpur, Odisha
05.2013 - 09.2016
  • Commissioning of sinter plant of 5.75 MTPA (496 Sq. M) for Tata steel kalinganagar, Odisha.
  • Commissioning of process equipment like conveyor, vibrating screen, pneumatic dust conveying system, E.S.P, PD system, oil & grease lubrication system, process fan, mixture, sinter machine, sintercooler, E.O.T cranes and hoist for sinter plant.
  • Commissioning of utilities for sinter plant like air compressor, re-circulating and process water pumps, firefighting system, HVAC (Chiller/AHU) system, diesel generator and chemical dosing system.
  • Coordinated discussions among teams to establish a detailed trial plan for successful commissioning. with electrical, structural and instruments team and prepare trial plan for commissioning activity.
  • Planned and coordinated mechanical, electrical, and instruments teams along with equipment suppliers to achieve trial plan schedule.
  • Coordinated mechanical, electrical, and instruments teams to ensure seamless project execution.
  • Completed equipment erection on schedule while adhering to quality requirements.
  • Fabrication and erection of material handling system for sinter plant according to standard drawings.
  • Fabrication of conveyor and chutes for material handling system for processing in sinter plant.
  • Preparing SOP and ensuring it is followed during commissioning.
  • Managed client and contractor billing, along with maintenance of documentation including material reconciliation and protocols.

Planning Engineer

Hindalco Aluminum Limited
Singrauli, Madhya Pradesh
11.2012 - 05.2013
  • Coordinated project planning and progress monitoring to ensure alignment with project timelines and deliverables.
  • Prepared executive summary reports, management review reports, management information system reports, and project documentation reports to inform stakeholders and support decision-making.
  • Facilitated client coordination and managed client billing for supplies and executed works according to unit rate and EPC basis.
  • Performed materials reconciliation to verify stock levels and prevent discrepancies.

Execution Engineer (Trainee)

Hindalco Aluminum Limited
Singrauli, Madhya Pradesh
12.2010 - 11.2012
  • Prepared and monitored work execution programme on daily, weekly, and monthly basis to ensure timely project progress.
  • Coordinated with site execution team to meet project milestones and deliverables.
  • Fabrication, erection, and commissioning of pot superstructure and positive riser for a 0.35 MTPA aluminium smelter project.
  • Conducted quality control checks to ensure compliance with safety regulations.
  • Reconciled bulk and structural materials to maintain accurate inventory and support project efficiency.

Education

B. Tech - Engineering Technology

BITS Pilani
Pilani, RJ
12-2022

Diploma - Mechanical Engineering

Parul Institute
Vadodara, GJ
01-2010

High School -

Dr. N. G. Shah high school
Vaghodia, GJ
01-2007

Skills

  • EPC Execution
  • Project management
  • Structural Fabrication & Erection
  • Coke Oven & BPP Projects
  • Commissioning
  • Safety Compliance
  • Quality Assurance
  • Resource Planning
  • Risk assessment
  • Modular construction
  • Contractor Management
  • Steel Industry

Languages

English
Advanced
C1
Hindi
Proficient
C2
Gujarati
Proficient
C2

Certification

  • Project Management Professional (PMP) – In Progress

Timeline

Execution Lead (Deputy Manager)

Adani Infra (India) Limited
12.2024 - Current

Execution In charge (Asst. Manager)

Larsen and Toubro Limited
01.2023 - 12.2024

Execution In charge (Asst. Manager)

Larsen and Toubro Limited
10.2021 - 01.2023

Senior Engineer

Larsen and Toubro Limited
09.2016 - 10.2021

Execution and commissioning Engineer

Larsen and Toubro Limited
05.2013 - 09.2016

Planning Engineer

Hindalco Aluminum Limited
11.2012 - 05.2013

Execution Engineer (Trainee)

Hindalco Aluminum Limited
12.2010 - 11.2012

B. Tech - Engineering Technology

BITS Pilani

Diploma - Mechanical Engineering

Parul Institute

High School -

Dr. N. G. Shah high school
Hemant Patel