Summary
Overview
Work History
Education
Skills
Personal Information
Languages
DECLARATION
EDUCATION & PERSONAL DETAILS
Timeline
Generic

HIMANSHU BHATIA

Kanpur

Summary

Project manager with extensive experience leading planning and execution at Rajdeep Engineering Systems. Proven track record in cost control and client coordination to support quality compliance and on-time delivery. Skilled in risk analysis and team management through clear communication and strategic oversight.

Overview

18
18
years of professional experience

Work History

Project Manager

RAJDEEP ENGINEERING SYSTEMS PVT. LTD.
PUNE
03.2026 - Current
  • Project planning, internal kick-off meetings and preparation of project schedules using MS Project / Excel.
  • Project progress monitoring, milestone tracking and preparation of weekly project status reports.
  • Client coordination, internal review meetings and technical query / clarification management.
  • Coordination with Design, Purchase, Production, QA, Site teams and other internal functions.
  • Drawing review, approval coordination and engineering change / revision management.
  • Production and fabrication follow-up, quality compliance and delivery schedule monitoring.
  • Oversaw project budget, monitored expenses, validated BOQ, and handled billing.
  • Project risk identification, delay analysis and recovery plan preparation.
  • Dispatch planning, logistics coordination and preparation of packing slips, dispatch labels and shipping documents.
  • Coordinated site installation, commissioning, and trial runs, ensuring smooth project handover.
  • Monitored subcontractor/vendor performance, ensured customer satisfaction, and coordinated project close-out.
  • Sudarshan Chemicals – Material Handling System
  • National Cement Company – Export Order / Material Handling Project
  • MB Sugars, Gujarat – Material Handling System
  • Ambuja – Material Handling System
  • Petra Silicon – De-Silica / Material Handling System
  • Ion Exchange – Chemical Handling System Supplies

Project / Site Execution

TRASMEC INDIA PVT. LTD.
Pune
12.2024 - 03.2026
  • Supported project execution and provided technical guidance for erection of fuel handling and ash handling equipment, ensuring alignment with project specifications.
  • Coordinated with site teams to resolve erection issues, implementing solutions to prevent recurrence in future projects.
  • Collaborated with design and purchase teams on equipment cost-saving opportunities with the Italy design team, optimizing equipment design and contributing to overall project cost efficiency.
  • Reviewed drawings with engineering and design teams to ensure accuracy and rectify structural mismatches.
  • Assisting in installation of bucket elevator, moving floor, crusher, belt conveyor, screw conveyor, chain conveyor, ash silo, ash / grate ash screw, storage hopper, de-dusting system (conditioner), and interconnecting chutes with related structures.
  • Handling projects and sites at Milky Mist Dairy – Coimbatore, Sarvaraya Sugars Pvt. Ltd. (sister concern of Coca-Cola) – Eluru, Mondelez – Sricity, Agristo – Bijnor, Snathan Polycot – Punjab, AB Mauri – Pilibhit, Mondelez – Baddi, Aarti Jhagadai – Bharuch, and Arti Alchemie – Ankleshwar.
  • Milky Mist Dairy – Coimbatore
  • Sarvaraya Sugars Pvt. Ltd. (Sister concern of Coca-Cola) – Eluru
  • Mondelez – Sricity
  • Agristo – Bijnor
  • Snathan Polycot – Punjab
  • AB Mauri – Pilibhit
  • Mondelez – Baddi
  • Aarti Jhagadai – Bharuch
  • Arti Alchemie – Ankleshwar

Project / Site Execution

FLUIDLINE ENGINEER & FABRICATORS PVT. LTD.
01.2009 - 01.2024

Project Manager

Saint Gobain India Industries Pvt. Ltd. & Forbes Vyncke Pvt. Ltd. (Gyproc Plant)
Vishakapatnam
08.2023 - 10.2024
  • Completed construction of 48 TPH boiler to support operations
  • Coordinated labor mobilization for on-time project execution
  • Fuel Handling System installation & erection
  • Ash Handling System installation & erection
  • Pneumatic System installation & erection
  • IBR piping & IBR approval from local IBR authorities
  • Conducted IBR material inspections to meet regulatory compliance
  • Assembled structures to enhance project integrity
  • Boiler equipment ground inspection

Project Manager

Biological E
11.2020 - 04.2022
  • Executed utility piping installations, enhancing operational efficiency
  • Oversaw workforce deployment on site
  • Boiler erection & installation of 2 TPH & 4 TPH
  • Applied insulation materials, contributing to improved energy efficiency
  • Fabricated and erected pipe racks, supporting project infrastructure
  • Chimney erection
  • UDAF erection & installation

Project In Charge

Nerloac Paints Ltd., Kanpur (Jainpur)
06.2020 - 12.2020
  • Executed erection and alignment of structural materials to ensure project specifications were met
  • Installed reactors and mixers to enhance production capabilities
  • Installed tanks in designated locations to support operational needs and pump installation with connections
  • Heat exchanger installation
  • Piping fabrication & erection on pipe rack for oil, air & water
  • Receipt and physical inspection of pre-fabricated structural and piping materials as per erection drawings
  • Maintained DPR and erected-material records in Excel to support project tracking and compliance
  • Facilitated shutdown operations, ensuring minimal downtime and preserving equipment integrity

Project In Charge

Hindustan Unilever, Punjab (Rajpura)
09.2019 - 02.2020
  • Executed structure erection and painting, contributing to timely project completion.
  • Erected structures and coordinated with the project team for alignment clearance.
  • Inspected fabricated structures and spools, marking for quality assurance.
  • Compressed air piping fabrication and equipment connection

Project In Charge

Akron India Pvt. Ltd., H.P. (Paonta Sahib)
03.2014 - 07.2019
  • Receipt and maintenance of piping material spools for site consumption
  • Preparation of piping erection material and submission to QC team for clearance
  • Facilitated Goringer line shifting and erection, improving project workflow efficiency
  • Coordinated inject line erection and shifting, ensuring timely project completion
  • Heat exchanger installation
  • Pipe rack fabrication and erection
  • Structure platform fabrication & erection
  • Cooling tower pump erection & installation with complete piping
  • Executed clean room piping installation, adhering to project standards and specifications
  • Primary / secondary pump erection & piping
  • Reconciliation with client and handover of surplus materials with documentation

Site In Charge

ITC Ltd., Kolkata
02.2014 - 09.2014
  • Completed boiler and chimney installation, contributing to enhanced operational efficiency.
  • Secured approvals from IBR authorities to ensure compliance with regulatory standards.
  • Inspected pre-fabricated structural and piping materials according to erection drawings.
  • Maintained daily progress reports and erected-material records in Excel for project tracking.
  • Boiler structure & piping work

Site In Charge

Syngene International, Mangalore
01.2013 - 12.2013
  • Facilitated equipment relocation to enhance operational efficiency through strategic placement and erection
  • Implemented safeguards for materials against environmental hazards, ensuring protection from fire, damage, dust, adverse weather, and theft
  • Pipeline erection & fabrication
  • Solvent line fabrication & erection
  • Hot well / cold well erection & piping
  • Heat exchanger erection & piping
  • Site worker handling and fabrication / erection of spools
  • Received materials according to the packing list for accurate inventory management

Supervisor

Hindustan Unilever, Punjab (Rajpura)
10.2011 - 11.2012
  • Completed installation of bag filter equipment to optimize emissions control and environmental compliance
  • Fuel Handling System installation & erection
  • Ash Handling System installation & erection
  • Boiler erection and piping
  • Erected chimney structure on-site, enhancing the facility's operational capacity
  • Conducted structural built-up fabrication and fit-up inspection to ensure compliance with safety standards and specifications

Supervisor

Nestle India Ltd. & Microlabs, Goa
10.2009 - 09.2011
  • Constructed process piping to support efficient manufacturing operations
  • CS & SS 304/309 piping and AHU erection
  • Structure fabrication & erection
  • Laid utility piping for connection of essential services
  • Constructed DG chimney to enhance ventilation efficiency

Education

Bachelor of Arts -

DAV PG COLLEGE
KANPUR
06-2004

Skills

  • Project planning
  • Project scheduling
  • Project execution
  • Progress reporting
  • Cost control
  • Risk management
  • Risk analysis
  • Site execution
  • Site coordination
  • Logistics Coordination
  • Drawing review
  • Quality control
  • Quality inspection
  • Material procurement
  • Vendor management
  • Vendor coordination
  • Client communication
  • Client coordination
  • Team coordination
  • Conflict Resolution
  • Progress reporting

Personal Information

  • Title: PROJECT MANAGER | EPC PROJECT EXECUTION | MATERIAL HANDLING | SITE & ENGINEERING
  • Date of Birth: 1986-03-25
  • Nationality: Indian
  • Marital Status: Married

Languages

Languages Known: Hindi & English

DECLARATION

I hereby declare that the above particulars are true to the best of my knowledge and belief.

EDUCATION & PERSONAL DETAILS

Educational Qualification: Graduate

Timeline

Project Manager

RAJDEEP ENGINEERING SYSTEMS PVT. LTD.
03.2026 - Current

Project / Site Execution

TRASMEC INDIA PVT. LTD.
12.2024 - 03.2026

Project Manager

Saint Gobain India Industries Pvt. Ltd. & Forbes Vyncke Pvt. Ltd. (Gyproc Plant)
08.2023 - 10.2024

Project Manager

Biological E
11.2020 - 04.2022

Project In Charge

Nerloac Paints Ltd., Kanpur (Jainpur)
06.2020 - 12.2020

Project In Charge

Hindustan Unilever, Punjab (Rajpura)
09.2019 - 02.2020

Project In Charge

Akron India Pvt. Ltd., H.P. (Paonta Sahib)
03.2014 - 07.2019

Site In Charge

ITC Ltd., Kolkata
02.2014 - 09.2014

Site In Charge

Syngene International, Mangalore
01.2013 - 12.2013

Supervisor

Hindustan Unilever, Punjab (Rajpura)
10.2011 - 11.2012

Supervisor

Nestle India Ltd. & Microlabs, Goa
10.2009 - 09.2011

Project / Site Execution

FLUIDLINE ENGINEER & FABRICATORS PVT. LTD.
01.2009 - 01.2024

Bachelor of Arts -

DAV PG COLLEGE
HIMANSHU BHATIA