Summary
Overview
Work History
Education
Skills
Training
Disclaimer
Languages
Personal Information
Timeline
Generic
INDRA KUMAR TIWARI

INDRA KUMAR TIWARI

Amethi

Summary

Experienced in production line operations, manufacturing processes, and quality control. Strengths include efficiency, teamwork skills, and ability to adapt to changing demands.

Overview

8
8
years of professional experience

Work History

Production Executive

Raychem RPG Pvt Ltd
Naigaon
05.2024 - Current
  • HIRA Certified by Chola MS
  • Work permit
  • Make WI & Single point lesion for every process.
  • Manpower handing and utilize their efficiency and meet targets.
  • Inventory Management & Rejection control.
  • Meet the Production Target day-to-day basis.
  • Analyze & immediate action of Production difficulties.
  • Daily Failure analysis and Act plan
  • Manufacturing & assembly of gas meters and EBU
  • Monitored production line for efficiency and safety compliance.
  • Met or exceeded target for on-time customer shipments.

Production supervisor (Engineer-1)

Secure meters limited
Sanand
10.2021 - 05.2024
  • Deep Knowledge of Gas Meter and Energy Meters.
  • Knowledge of PCB and Electronics component.
  • Keep understanding electronic & Mechanical components and their behavior.
  • Knowledge of Oracle & E-Bizz
  • Daily production hourly monitoring report & OEE (performance, availability, quality).
  • Extensive knowledge of troubleshooting and handling issues generate at shop floor.
  • Implementation of kaizen and Poka-yoke at all possible stages on Line.
  • Improving production through total customer satisfaction by improving quality and speed at zero level rejection.
  • Manufacturing & assembly of Energy and gas meters

Assistant production Engineer

Subros limited
Karsanpura
12.2017 - 10.2021
  • Daily production report & gap analysis.
  • Inspects assembled products to ensure they are up to quality.
  • Updating Monozukari board for daily work management such as OEE, AOP, cost management etc.
  • Coordinate with PPC for daily production planning.
  • Coordinate with Logistics for bin availability and daily DI schedule.
  • Inspection of all process that and assured that manpower are work with their WI.
  • Implement JIT system and maintain.
  • Assured production part flow as per kanban system.
  • Conducting Red-bin activity with our cross-function team & take appropriate plan to facilitate fast decision making.
  • Manufacturing & assembly of Auto air conditioning system

Education

ITI - electronic mechanic

PT Murlidhar Tripathi ITI
Sultanpur

Diploma - Electronic Engineering

Sanjay Gandhi Govt. Poly technic
Jagdishpur, Amethi

10th -

AH inter college
Jagdishpur

12th -

AH inter college
Jagdishpur

Skills

  • Lean manufacturing
  • Troubleshooting
  • Equipment maintenance
  • Machinery repair
  • Product assembly
  • Log keeping
  • Defect elimination
  • Repair cost reduction
  • Control plan documentation
  • PFMEA documentation
  • Physical dexterity
  • Assembly of small parts

Training

  • 5-S
  • SPC
  • EHS
  • Kaizen
  • IATF
  • Kanban system
  • Metrology Awareness
  • GD&T
  • Integrated Management System
  • 7 QC Tools
  • Quality Circle
  • Problem solving technique.

Disclaimer

I hereby declare that the above information is true to the best of my knowledge and belief.

Languages

  • Hindi
  • English

Personal Information

  • Father's Name: Mr. Ram Avtar Tiwari
  • Mother's Name: Mrs. Urmila Devi
  • Date of Birth: 10/05/93
  • Gender: Male
  • Nationality: Indian
  • Marital Status: married

Timeline

Production Executive

Raychem RPG Pvt Ltd
05.2024 - Current

Production supervisor (Engineer-1)

Secure meters limited
10.2021 - 05.2024

Assistant production Engineer

Subros limited
12.2017 - 10.2021

ITI - electronic mechanic

PT Murlidhar Tripathi ITI

Diploma - Electronic Engineering

Sanjay Gandhi Govt. Poly technic

10th -

AH inter college

12th -

AH inter college
INDRA KUMAR TIWARI