Hardworking and ambitious Deputy Manager with a 20 year background in the infra and Renewable industry. Exceptional leadership and mediation traits. Dedicated to ensuring all associates provide the highest level of customer service.
Overview
20
20
years of professional experience
Work History
Dy.Manager survey
Axis Energy Ventures India Pvt. Ltd
Hyderabad
06.2016 - Current
Monitoring of survey works day to day
Land identification within boundary of villages along with survey numbers and type of land for wind and solar projects
Digital Mapping and Auto CAD drawings for present and upcoming projects as per the required
Preparation of wind/Solar Land footprint CAD drawings and supporting the land acquisition team
Preparing complete feasibility survey report for the upcoming Solar and wind projects
Preparation of all data, maps, records, and documents related to survey, Preparation of met mast topographical drawings on topo sheet as per BD Team requirement
Preparation of projects related to micro sitting detail drawings and preliminary survey reports
Preparation of project electrical line layout as per the required user department
Preparation of drawings A.P., Rajasthan, and any other state as per BD Team requirement
Preparing as per enjoyment field measurement sketch in Bhoomithi software
Aligned the as per filed survey FMB Taken by Old kandam stones GPS co-ordinates with technical verifications
Drafting in cad as per surveying all locations and pathways combined sketch
Preparing the individual every location with pathway sketch to submit client
Preparing all projects Village maps aligned with survey map of India tope sheet with GPS Co- ordinates
Preparing all projects related to as-built drawings and submitted the client
Formulated sub-contractors’ bills and prepared comparative statement for client billing vs sub- contractors billing
Preparation of all types of Work Order & Variation Orders for all Subcontractors
Supplier Bills and Sub – Contractors Bills & Client Bills along with Preparation
Responsible for keeping the records and maintaining all files related to the Interim Payment Claims and Certificates and Subcontractor bills
Co-Ordination with Site Engineers and other Quantity Surveyors on the Project.
Sr.Surveyor
Sew Infrastructure Ltd.
Chattishghar
12.2012 - 06.2016
Assigning day to day duties to the subordinates
Co-coordinating with the Clients & Representative Engineers
Horizontal & Vertical Traversing for TBM's & Control points Fixing
Layout Marking of Chimney, TG, Boiler& ESP buildings, track hopper
Supervise & Conduct Topographic Survey
Preparing the Survey schemes given co-ordinates, levels & checking the consultant & Approval the work
Preparing to as per drawing co ordinates
Downloading Data from Total Station & Format for drafting work
Stakeout of as per drawing coordinates Plotting
Preparing Auto cad Drawings for survey schemes
Assist Team leader and Quantity Surveyor on all aspects
Study of working drawings, BOQ and specification
Preparation of Bar Bending Schedule of RFC drawings and ensure it is placed according to prepared BBS
Co-ordination with Quality control team in development of foundation works for quality checks as required at site
Preparation of sub-contractors’ bills of bar benders, machinery on hire, material contractors and lab our contractors
Prepare and submit the progress reports on daily, weekly and monthly basis to the Project Manager
Maintaining and preparing the proper record of bills with Clients and as well with the Subcontractors
Estimating all Quantities as per the RFC Drawings
Coordinating with the clients and colleagues for the work progress and updating the status as per the schedule prepared
Material Management for Free of Supply materials from client stores and its reconciliation month wise
Maintaining and preparing the proper record of bills with Clients and as well with the Subcontractors
Site Execution, site planning, site field Quality Checking, and subcontractor billing
Preparing the As built Drawings Submit to Client.
Surveyor
Sew Infrastructure Ltd.
Vishakhapatnam
12.2008 - 07.2011
Horizontal & Vertical Traversing for TBM's & Control points Fixing
Preparing of foundation drawings
Preparing Auto cad Drawings for the execution Of works
Layout for Structural works
Taking the Building layout Plans & Stakeout the building location
Checking the consultant & Approval the work
Doing all checking of Bolt points location & Execution of the work
Mechanical work-ID -Fan, sugary tank, duet, G is duet, idelat, vessels,etc.LD#2 zone,&LD#1 TISCO survey for mechanical work (caster#01,02, CC#2 etc) of LD#01,&H.S.M Zone of TISCO
Survey for mechanical work (BLAST FURNASE,TRANSFORMER TRACK,ETC)G.Blast Furnace and H.Blast Furnace zone in TISCO
Survey for building structural, gas water pipeline structural, junction house for conveyer line structural etc
Detailed survey work for conveyer route at RAW material handling plant (R.M.H.P) area in vizag &TISCO Track stopper #3
Building layout at pile point layout for conveyer route trestle foundation SMS Area in vizag
Structural alignment of junction house and Trestle leg of conveyer at (R.M.H.P) in vizag
Proposed road and setting out the curve for rain at vizag steel plant area in Vishakhapatnam
Preparing the daily report & submitting the subordinates.
Surveyor
SOMA ENTERPRISE LTD.
Bangalore
01.2007 - 11.2008
Assigning day to day duties to the subordinates
Horizontal & Vertical Traversing for TBM's & Control points Fixing
Preparing Road levels and Dip sheets
Preparing Auto cad Drawings for the execution Of Road & Bridge works
Taking levels for Cross section
Horizontal Traversing, Stakeout the Centerline, Topographical Survey
Layout for Structural works
Preparation of Intersection Drawings as per G.F.C
Involvement And Discussions the Site execution works in corresponding Engineers
Clearance of ROWs within the Package
Taking the Building layout & Stakeout the building location
Preparing the layers with in given levels & checking the consultant & Approval the work
Checking of pillar location & Road alignments & Execution of the work
Preparing the daily report & submitting the subordinates.
Jr Survey Engineer
SRI SAI AVANTHIKA CONSTRUTION
Rajasthan
08.2004 - 12.2006
Assigning day to day duties to the subordinate
Marking of Pipe as given Drawing
Horizontal & Vertical Traversing for TBM's & Control points Fixing
Preparing Auto cad Drawings (for the execution Quantity)
Taking levels Cross section
Horizontal Traversing, Stakeout (the Centerline), Topographical Survey
Layout for Lands detailing works
Involvement And Discussions the Site execution works in corresponding Engineers.
Education
Diploma (Civil) -
SMVM Polytechnic
03-2004
Secondary -
Board of Secondary Education AP
03-2000
Skills
Windows XP, 2000, 98
Ms-office, Auto CAD, Global Mapper, Arc GIS, Revit Architecture
Project Management
Email
moan143@gmail.com, mohankalabandi@rocketmail.com
Mobile
0973799200, 7337350948
Total Station Proficiency
Leica-703,705, 1200, 1201, TSO6
Pen tax
Theo light Digital & Manuel
Hand GPS
Personal Information
Date of Birth: 06/04/85
Marital Status: Married
Accomplishments
Certificate of Appreciation for achieving the land acquisition milestone of the 300MW (NTPC) project.
I am receiving the Spot award as the best employee.
Timeline
Dy.Manager survey
Axis Energy Ventures India Pvt. Ltd
06.2016 - Current
Sr.Surveyor
Sew Infrastructure Ltd.
12.2012 - 06.2016
Surveyor
Sew Infrastructure Ltd.
12.2008 - 07.2011
Surveyor
SOMA ENTERPRISE LTD.
01.2007 - 11.2008
Jr Survey Engineer
SRI SAI AVANTHIKA CONSTRUTION
08.2004 - 12.2006
Diploma (Civil) -
SMVM Polytechnic
Secondary -
Board of Secondary Education AP
Similar Profiles
Arafat Wasim SiddiquiArafat Wasim Siddiqui
Manager-Legal at Axis Energy Ventures India Private LimitedManager-Legal at Axis Energy Ventures India Private Limited