Summary
Overview
Work History
Education
Skills
Timeline
Generic

Kamal Prabu Gunaseelan

DEPUTY MANAGER - PROJECT DEVELOPMENT
TIRUVANNAMALAI,TAMILNADU

Summary

Punctual Deputy Manager looking to obtain a position where outstanding communication and problem-solving talents can be fully utilized. Positive, ambitious and motivational. Proven background in providing supervision and development opportunities to associates.

Overview

10
10
years of professional experience
8
8
years of post-secondary education
4
4
Languages

Work History

Deputy Manager

BANGALORE INTERNATIONAL AIRPORT LIMITED
Bengaluru
05.2016 - Current
  • Managing Engineering Design for Electrical and Fire fighting works .
  • Technical & Design review of Drawings , Specifications and Post contract Documents .
  • Managing the Project Coordination in day to day work .
  • Planning for the Material and Man power requirement as per the construction program and ensure the same .
  • Handling Vendor Negotiation and bring the price within the budget and saving the cost without compromising Technical Qualification .
  • Adopting and following the HSE Policy and achieving zero accident to safe man power working .
  • Design & Execution of internal & external MEP Works .
  • Installation , Testing & Commissioning of RMU , Transformer ,MV & LV Panels , APFC , MCC .
  • Building Management System Installation , Testing & Commissioning for airport & Commerical Projects.
  • Fire alarm System Installation , Testing & Commissioning for airport & Commercial Projects .

Engineer

GVK Power and Infrastructure Ltd .
SRINAGAR GHARWAL
10.2015 - 04.2016
  • As an eminent Shift In charge for optimized control and dispatch in just in time method for shift operations .
  • Uniform Power Declaration , Declare Capacity , Load Scheduling , Level Control , Capacity index .
  • Plant Start and Stop in real time analysis (GPS).
  • Providing Notification , Complain , Work Permit , Isolation , Normalisation using SAP PM Module . Raising PR ,PO, Spare & Budget using MM Module .
  • Preparing Energy Report, Daily Generation Report (DGR), CEA Report , MIS Report , Tripping and analysis report, Exception report as and When required by the technical wings from master data base in SAP application .

Engineer

KALPATARU POWER TRANSMISSION LIMITED
GUJARAT
07.2013 - 09.2014
  • HT Transmission Line Shutdown Incharge.
  • Worked as Foundation , Erection , Insulator Hoisting and Stringing incharge for 765 KV DC Kurnool to Thiruvalam Transmission Line Project for Power Grid .
  • Worked as Foundation , Erection , Insulator Hoisting and Stringing incharge for 400 KV DC Mettur to Thiruvalam Transmission Line Project for TAN - TRANSCO .

Education

Master of Engineering - POWER SYSTEM

SKP ENGINEERING COLLEGE
TIRUVANNAMALAI
06.2010 - 05.2012

BE - Electrical And Electronics Engineering.

KAMBAN ENGINEERING COLLEGE
TIRUVANNAMALAI
06.2003 - 06.2007

PGDC in O&M in Transmission & Distribution - Power System

Power System Training Institute (NPTI)
Bangalore
07.2013 - 12.2013

Higher Secondary -

SRGDS Matric Higher Secondary School
Tiruvannamalai
06.2002 - 03.2003

SSLC -

SRGDS Matric Higher Secondary School
Tiruvannamalai
06.2000 - 03.2001

Skills

    Performance improvements

undefined

Timeline

Deputy Manager

BANGALORE INTERNATIONAL AIRPORT LIMITED
05.2016 - Current

Engineer

GVK Power and Infrastructure Ltd .
10.2015 - 04.2016

Engineer

KALPATARU POWER TRANSMISSION LIMITED
07.2013 - 09.2014

PGDC in O&M in Transmission & Distribution - Power System

Power System Training Institute (NPTI)
07.2013 - 12.2013

Master of Engineering - POWER SYSTEM

SKP ENGINEERING COLLEGE
06.2010 - 05.2012

BE - Electrical And Electronics Engineering.

KAMBAN ENGINEERING COLLEGE
06.2003 - 06.2007

Higher Secondary -

SRGDS Matric Higher Secondary School
06.2002 - 03.2003

SSLC -

SRGDS Matric Higher Secondary School
06.2000 - 03.2001
Kamal Prabu GunaseelanDEPUTY MANAGER - PROJECT DEVELOPMENT