B.Tech Civil Engineer with a record of sound and safe Civil Engineering construction aspects having professional experience (Bridge projects, Oil & Gas projects, Mining projects, etc.) of more than Seven (07) years. Adept at coordinating with Techno-Legal experts and professionals for every project stage. Strong multitasking ability with exceptional skill in functioning well in a high-pressure work environment.
Projects:
1. Civil, Structural & Containerized Works at OCS Nadua, Dibrugarh, Assam by Oil India Limited,
2. Civil, Structural & Containerized Works at GGS East Khagorijan, Dibrugarh, Assam by Oil India Limited,
3. Proposed Construction of G+5 Storied New HR Building Duliajan, Distt. Dibrugarh by Oil India Limited
Key Deliverables: The key responsibilities are as described,
Projects:
1. Project Co-ordination of “Construction of ROB at Chakradharpur between Mahalimarup & Rajkharsawan station under South Eastern Railway.”
2. Project Co-ordination of “Construction of Bridges over river Matla at Canning, by Hooghly River Bridge Commissioners.”
Key Deliverables:
Project:
Dakshineswar Rani Rasmoni Skywalk (First ever constructed Skywalk in Kolkata as well as West
Bengal and one of the finest structures of India constructed for pilgrims, which does connect the
Dakshineshwar Metro/Dakshineshwar Railway station and The Dakshineshwar Kali Temple as a 350m
long structure causing traffic de-congestion, pilgrims’ easy access and tourists’ attraction.)
Key Deliverables:
Project Execution: Execution of project (RCC work, Steel Structure work) as per approved technical
specifications (Drawings, Methodology etc.).
Project Billing: Preparation of BBS (Bar Bending Schedule) and calculation of executed and to be
executed quantity as per project schedule and prepare subcontractor and Client bills accordingly.
This engagement was on Behalf of Hooghly River Bridge Commissioners under Senior Project Engineer-III for which these below mentioned daily activities were carried out,
Key Deliverables: