Summary
Overview
Work History
Education
Skills
Interests
SUMMER INTERNSHIP DETAILS
STRENGTH
PASSPORT DETAILS
PERSONAL DETAILS
DECLARATION
Timeline
Generic
KISHAN KUMAR SINGH

KISHAN KUMAR SINGH

Mechanical Engineer
Maharajganj

Summary

Dynamic and results-driven professional dedicated to contributing to an organization that values skill utilization and fosters individual growth. Committed to making a significant impact on organizational success while continuously developing expertise. Proven ability to adapt and thrive in fast-paced environments, ensuring alignment with organizational goals. Passionate about leveraging talents to drive positive outcomes and enhance team performance.

Overview

4
4
years of professional experience
2
2
Languages

Work History

Site Incharge

Cooling Labs Engineers-LLP
12.2024 - Current

Project Name : Nidec Automation Pvt Ltd

Client Name: Minda Infrastructure LLP

Location: Belur-Kotur Industrial Area , Dharwad , Karnataka-580011


  • Created weekly and monthly reports and presentations for management team.
  • Maintained records and logs of work performed and materials and equipment used in Fire Fighting System, HVAC & HSD System.
  • Fire Fighting System including Pump Room, Sprinkler & Hydrant Work in buildings.
  • HVAC System including VRV , TFA & Hi-wall System.
  • HSD System including with Automation Work.
  • Commissioning All the equipment & handing over all projects system.
  • Managed subcontractors, ensuring quality workmanship and adherence to project timelines and specifications.
  • Ensured timely acquisition of permits and approvals, navigating complex regulatory environments effectively for smooth project progression.
  • Delivered high-quality results, ensuring rigorous adherence to building codes and safety regulations on all sites.
  • Improved construction site efficiency by implementing streamlined scheduling and resource allocation processes.

GAT Engineer

NTPC Limited
05.2023 - 12.2024
  • They are primarily responsible for the layout of overall plant facilities, the placement of equipment and process units in the plot, and the connected piping design as per the applicable regulations and standards to ensure safe operation of the facilities for the design life.
  • Perform heating and cooling load calculations and determine airflow requirements, identifying the sizes of air handling units, or chillers and boilers. In new construction, they interpret plans and blueprints and design ductwork and piping systems.
  • Finds faults, carries out repairs and maintenance, and services and tests HVAC units and systems. There may also be some installation work involved.

Site Engineer

Cooling Labs Engineers- LLP
08.2024 - 12.2024

Project Name: Maruti Suzuki India

Client Name: NTT DATA


  • Ability to understand design code specification.
  • Preparation of HVAC Site Quation & BOQ with estimation.
  • Knowledge of the TFA Unit Installation and Commissioning
  • Duct leak test according to SMACNA.
  • Ability to handle labours & site materials.
  • Ability to handle itesty works & records.
  • Ability to handle 3c documents and site record management.


Site Engineer

Greenwave Engineering Private Ltd.
12.2023 - 08.2024

Project Name: Exide Energy Solution Limited

Client Name: Integrated Cleanroom Technology Pvt. Ltd. (TAKASAGO Thermal Engineering)

  • Ability to understand design code specification.
  • Preparation of HVAC Site Quation & BOQ with estimation.
  • Knowledge of the pipe, manifold installation, duct installation & plant on installation of HVAC equipment.
  • Knowledge of the Cooling Tower Commissioning.
  • Knowledge of the AHU,FCU & chiller equipment Commissioning
  • Knowledge of the Chilled & Condenser Water Pump Commissioning
  • Knowledge of Hydrostatic/ Pneumatic testing of pipelines with manifolds.
  • Duct leak test according to SMACNA.
  • Ability to handle labours & site materials.
  • Ability to handle itesty works & records.
  • Ability to handle 3c documents and site record management.

QA Engineer with Project lead

Quality Evaluation And System Team Pvt. Ltd.
04.2022 - 05.2023
  • Ensure Quality Control activities at site are performed in accordance with relevant QCP, ITP, MS.
  • Consult all the documentation necessary for inspection (visits conducted with suppliers).
  • During inspection visits, monitor the implementation of HSE rules, the results of tests and inspections performed by suppliers.
  • Ensure Vendor Supplied materials are in compliance with Codes and Standards.
  • Supervision & Inspection of the installation & alignment of Static & Rotating equipment.
  • Updating the daily Inspection Status.
  • Action and close all customer complaints.
  • Project Name: Adani Total Gas Limited

Education

B. TECH - MECHANICAL ENGINEERING

AKTU
LUCKNOW
04.2001 -

INTERMEDIATE - PCM

CBSE BOARD
Siswa Bazar, Maharajganj,UP, India-273163
06-2017

HIGH SCHOOL -

CBSE BOARD
Siswa Bazar, Maharajganj, UP, India-273163
05-2015

Skills

    SAP (Material and Project Management)

Interests

Playing cricket & Football

SUMMER INTERNSHIP DETAILS

  • Organization Name: INDIAN POTASH LIMITED
  • Duration of Training: 4 weeks
  • Project Topic: Sugar Mill Process
  • Work Exposure: Boiler
  • Duration: Aug 25,2021 to Sep 25,2021

STRENGTH

  • Positive Approach & quick learner.
  • Believes in teamwork & listening to the experts.
  • Follower of professional Ethics.

PASSPORT DETAILS

  • Passport Number: W2277339
  • Place of Issue: Lucknow
  • Date of Issue: 2022-09-07
  • Date of Expiry: 2032-09-06

PERSONAL DETAILS

  • Adhaar No.: 595218540275
  • Father’s Name: Dhirendra Bahadur Singh
  • Date of birth: June 20,1999
  • Address: Belwa Chaudhary, Siswa Bazar, Maharajganj (U.P) India, 273163

DECLARATION

I hereby declare that the given particulars are true and connect  to the best of my knowledge & belief.





  Kishan Kumar Singh

Timeline

Site Incharge

Cooling Labs Engineers-LLP
12.2024 - Current

Site Engineer

Cooling Labs Engineers- LLP
08.2024 - 12.2024

Site Engineer

Greenwave Engineering Private Ltd.
12.2023 - 08.2024

GAT Engineer

NTPC Limited
05.2023 - 12.2024

QA Engineer with Project lead

Quality Evaluation And System Team Pvt. Ltd.
04.2022 - 05.2023

B. TECH - MECHANICAL ENGINEERING

AKTU
04.2001 -

INTERMEDIATE - PCM

CBSE BOARD

HIGH SCHOOL -

CBSE BOARD
KISHAN KUMAR SINGHMechanical Engineer