Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

MOHAMMAD DILSHAD

Prayagraj

Summary

Having a work experience of 4 years in the field of City Gas Distribution Network in Projects (Steel pipeline projects and Cathodic Protection) I am willing to take my career to next level and seeking new opportunities that will push me to grow and develop professionally. My background in these areas has given me a good overall knowledge and understanding of the processes and procedures involved, as well as the skill necessary to carry out projects from start to finish.

Overview

4
4
years of professional experience

Work History

Executive Engineer

Torrent Gas Pvt. Ltd
2019.07 - Current
  • Responsible for Preparation of monthly and daily progress reports, acting as crucial bridge between on-site operations and Head office and consistently delivering detailed progress reports enabling swift decision making and ensuring project milestones are met on time.
  • Collaborated extensively with statutory boards such as Railway, PWD-NHAI ,Nagar Parishad, PWD, Electricity, Irrigation & other regulatory bodies to secure critical RoU permissions
  • Led Route Planning, Survey, and feasibility studies for pipeline installations.
  • Supervised laying, testing, and commissioning of robust Steel network pipelines, maintaining stringent quality standards
  • Navigated complex regulatory processes, securing crucial approvals from Petroleum and Explosives Safety Organization (PESO) for CGS and steel pipeline networks. This ensured seamless compliance and project progress.
  • Developed comprehensive project scopes, milestones, and deliverables, creating intricate work breakdown structures and schedules at all levels
  • Supervised the Construction of City Gate station (above ground Station Piping) for gas custody transfer from GAIL Bharatpur, Gail India Agra
  • Conducted precise route surveys for Steel pipelines, meticulously crafting Statements of Requirements (SOR).
  • Established the IMS (Integrated Management System) implementation at the GA level, collaborating seamlessly with cross-functional teams to navigate site deviations resulting in reduction in project deviations and improved project alignment.
  • Supervised the installation and commissioning of Cathodic Protection systems, both temporary and permanent for network of 22 km, ensuring the longevity of the pipeline.
  • Supervision of Installation of CP System to ensure works are to the technical & quality requirements
  • Reviewed TCP, TLP design installations for cathodic protection and maintained TLP monthly monitoring records to maintain the integrity of pipeline
  • Implemented a rigorous Quality Control System in alignment with QA/QC plans, elevating project efficiency and safety
  • Proactively identified and mitigated hazardous activities and processes, establishing a culture of safety and risk reduction
  • Conducted daily safety assessments and consistently championed improvements in safety measures.

Education

B. Tech - Electrical andElectronics Engineering, Institutions

Dr. A.P.J. Abdul KalamTechnical UniversityK.I.E.T. Group
Ghaziabad
2019

XII -

CBSE Army Public School
Prayagraj
2014

X -

CBSE Army Public School
Prayagraj
2012

Skills

  • SAP Application PM & MM Modules
  • MS Word, MS-Excel, MS PowerPoint
  • Foundational understanding of Matlab

Accomplishments

  • Commissioning of CGS : Coordinated the successful commissioning of a City Gate Station (CGS), demonstrating expert project management skills and a deep understanding of gas infrastructure.
  • Supervised the installation and commissioning of a 132 inch-kilometer, (6-inch diameter) Steel pipeline, showcasing expertise in large-scale pipeline projects.
  • Spearheaded the installation and successful commissioning of Permanent Cathodic Protection at GA.
  • ISO Certification Auditor: Attained mastery in internal auditing of IMS ISO 9001:2015, ISO 14001:2015, and ISO 45001:2018 standards, culminating in successful examination clearance.
  • Actively engaged in specialized training programs covering SAP utilization, welding inspection, and non-destructive testing of steel pipelines, reinforcing a commitment to continuous improvement and expertise enhancement.

Timeline

Executive Engineer

Torrent Gas Pvt. Ltd
2019.07 - Current

B. Tech - Electrical andElectronics Engineering, Institutions

Dr. A.P.J. Abdul KalamTechnical UniversityK.I.E.T. Group

XII -

CBSE Army Public School

X -

CBSE Army Public School
MOHAMMAD DILSHAD