To obtain a position that will utilize skills while allowing to learn and grow as a productive member of the organization.
Overview
19
19
years of professional experience
Work History
Asst Manager
Atlas Copco India (Perceptron )
03.2019 - Current
Leading team - 5 members (Work allocation, Preparing work plan & Customer interactions), Virtual simulation for vision system, OLP generation for offline programming, Layout proposal and proto model development, Customer Interaction, Project Management.
Created employee schedules to align coverage with forecasted demands.
Leading Europe team in BCE as a SPOC (Work allocation ,Preparing work plan & Customer interactions), DPA5 studies for BIW component manufacturing feasibility, Process flow chart creation based on plant layout, Sealer manual & Spot pattern layout sequence sheet creation for EU, BIW fixture design (pilot program) & JPH improvement jigs, Ergo study.
Listened and responded to customer requests and forwarded necessary information to superiors.
Design Engineer
TATA Technologies Limited
03.2012 - 11.2013
Understanding GD&T for BIW data, Understanding gauge section for given body panels, Develop the concept design for Assembly jig, Weld gun human simulation and weld gun feasibility check, Creating feedback sheet for gun simulation, 3D model quality check, Support to tool design team.
Design Engineer
Hirotec India Pvt Limited
11.2010 - 02.2012
Understanding of GD&T for BIW data, Maintain the customer standard for fixture design & 2D drawings, Layout understanding for full process, Selection of NAAMS standard, Pay load calculation & Material selection
Conducted engineering studies on design for products, associated and subsystems components and structures.
Apprentice Trainee (Nov 2005 to Nov 2006), Assistant (Nov 2006 to Mar 2007), Design engineer (Jun 2010 to Oct 2010)
Titan Industries Limited
11.2005 - 10.2010
Material Inspection as per the 2d drawings, Assemble the components as per the assembly drawing, In House fabrication & rework of machine elements, Hydraulic and pneumatic circuit assembly & testing, Understanding customer requirements for building a new machine for their component, Prepare machine 3D Model for the entire machine, Ordering STD elements after getting approval from the customer, Preparing detailed drawings and releases it for manufacturing, Release the assembly drawings, test chart, and BOM for the assembly, Coordinate with the assembly for the further process of the project
Workshop Manager - MRCC at EPIROC MINING INDIA PVT LIMITED (A group of Atlas Copco India Limited)Workshop Manager - MRCC at EPIROC MINING INDIA PVT LIMITED (A group of Atlas Copco India Limited)