Summary
Overview
Work History
Education
Skills
Interests
Timeline
Training
Disclaimer
Section name
Hi, I’m

MUKESH KUMAR AGARWAL

Durgapur
MUKESH KUMAR AGARWAL

Summary

Results-driven management professional with extensive experience in leadership roles. Skilled in strategic planning, team collaboration, and driving operational efficiency. Adept at adapting to changing needs and ensuring consistent, high-quality outcomes. Known for strong interpersonal skills, problem-solving abilities, and focus on achieving organizational goals.

Overview

3
Languages
19
years of professional experience

Work History

AFCONS INFRASTRUCTURE LTD

Deputy Manager-TBM
04.2023 - Current

Job overview

  • Erection/commissioning/operation/maintenance of o2 TBMS S710& S1
  • Provided project oversight for construction activities.
  • Coordinated umbilical drive arrangements and execution for TBM S710.
  • Established chilling plant, air compressor, grout plant, silos, and site services, while maintaining and monitoring SAP data.
  • Allocated resources to site team while monitoring budget and planned costs.
  • Maintaining IMS Procedures & ISO Documents.
  • DELHI METRO PROJECT PKG-5/3574 & pkg-7/3573

AHMEDABAD METRO

P&M In charge -TBM
02.2022 - 04.2023

Job overview

  • Remanufacturing of o2 TBMS S710& S1
  • Procurement of total spares from OEM & others services for Remanufacturing of TBMS.
  • Procured spares from OEM and alternative sources for TBM remanufacturing.
  • Monitored cost discrepancies between planned and actual expenditures.
  • Dismantling of our TBMS's & shifting from Ahmedabad to Delhi.
  • Spare parts Management.

MUMBAI PUNE EXPRESSWAY LINK PROJECT

Sr. Engg Mechanical
07.2019 - 02.2022

Job overview

  • Installed, erected, commissioned, and maintained equipment including batching plant MI/CP-30, 60T gantry cranes, weighbridge, workshop setup, and casting yard for I girder casting.
  • Ensured reliable SAP data management to support operational efficiency.
  • Coordinated maintenance and management of all hired equipment to ensure availability.
  • Executed preventive and predictive maintenance for all site equipment.

AHMEDABAD IHETRO PROJECT

Mechanical Engineer
01.2018 - 07.2019

Job overview

  • Executed erection, commissioning, and maintenance of TBM HK-1134 and HK-717.
  • Hyperbaric arrangements including Medical lock,Conducted Man1ock testing with a third party to ensure safety standards were met.
  • Designed and optimized mechanical components for efficiency and performance.
  • Led cross-functional teams to implement design improvements and reduce production downtime.
  • Developed detailed project specifications and technical documentation for engineering projects.

CHENNAI METRO PROJECT

Mechanical Engineer
08.2016 - 01.2018

Job overview

  • Launching,Commissioning,operation & maintenance of TBM'sRobbins EPB Machine 6.6m dia. & HK-710,6.6M DIA
  • Led design and development of mechanical systems to enhance project efficiency.
  • Implemented innovative engineering solutions, reducing material waste in production processes.
  • Coordinated cross-functional teams to ensure seamless integration of mechanical systems.

HINDUSTAN CONSTRUCTION COMPANY LIMITED

MECHANICAL ENGINEER
02.2014 - 08.2015

Job overview

  • Operation of 6600mm dia EPB Machine ,Make-HK. Erection and Operational Maintenance of HERRENKNECHT E.P.B Machine 6600mm in diameter
  • Foam unit with control drives, chilling plantand backfill grout system.
  • Responsible for TBM operation in accordance with the manufacturer’s guidelines.
  • Maintenance of face pressure within the bulkhead and screw conveyor.
  • Monitoring grease consumption for the bearing sealing system to seal against face pressure hydrostatic and annular grout pressure.
  • Responsible for monitoring the excavated material throughout the mining cycle to minimize the risk of over excavation
  • Maintenance of Equipment,includes pick & carry crane,JCB backhoe loader,D.G Sets,Concrete pumps.
  • Erection & Maintenance of Pantry Cranes.
  • Maintaining all ISO Documents & Handling Audits.
  • Supervision of Running & Maintenance activities of Hired Equipment & Subcontractor Equipments,which includesCrawler cranes(TFC-280,KOBELCO-+500),Mobile cranes(GROVE CRANE),Excavators,Loaders,Piling Rigs,Grab Machines etc.
  • In charge of sites Sites,Dasrathpuri Station & Dabrimore station.
  • Attend breakdowns, troubleshooting.
  • DELHI METRO RAIL PROJECT,CC-34

MAROSHI RUPAREL TUNNEL PROJECT, SANTACRUZ, MUMBAI

MECHANICAL ENGINEER
03.2010 - 02.2014

Job overview

  • Eection ,Commissioning & Maintenance of Underground Passanger Hoist(60 metre Depth),capaCity-5 &
  • Erection ,Commissioning & Maintenance of Underground Muck Rmoving Winch.Capacity-12-5tOil
  • Erection, Commissioning & Maintenance of Gantry cranes,capacity-+ston,Derrickcrane,capacity-ioton.
  • Daily inspection of wire ropes of winch,lifts,cranes & taking corrective action.
  • Erection, Commissioning &Maintenance of Rack & Pinion type passenger lift(60 metre depth)
  • Maintenance of all Mechanical Equipments & maintenaining their healthy condition at site.
  • Operation of 3.6mdia Hard rock Tbm.
  • Maintenance of Tunneling equipments which includes Jack Hammers,Rock Dril1,Pusher Leg,Pneumatic Lubricators
  • Maintenance of Locomotives,Agitator cars & Supervision of Running condition inside tunnel.
  • Maintenance of all Mechanical Equipments & maintenaining their healthy condition at site.
  • Responsible for all activities for oi1 Shift at site.

TEESTA LOW DAM HYDROELECTRIC PROJECT — IV, KALIJHORA, WEST BENGAL.

JUNIOR ENGINEER
05.2008 - 02.2010

Job overview

  • Maintenance / repair / refurbishment of heavy construction machineries which includes Earthmoving Equipments like Dozer, loaders Excavator, excavators, excavator cum loader, static & vibratory roller.
  • Maintenance of 35 TPH & 25 TPH crushing Plant.
  • I)Maintenance of Jaw crusher,cone crusher & Barmac,VS1.
  • Ii)Maintenance of Screens.
  • Iii)Maintenance of Conveyor system.
  • Iv)Maintaining the quality of aggregates.

TARA PLANT & EQUIPMENT WORKSHOP, MUMBAI

TRAINEE ENGINEER
11.2007 - 04.2008

Job overview

  • Dismantling & assembly of Diesel engines which includes Leyland engines ALU 402,ALU680,CAT Engines 3306,3406,3412,CumminsEngines 6CT 6.3,6CT 5.4
  • NT 855.TATA Engines Tata 694
  • Dismantling 8r Assembly of Hydraulic Pumps which includes variable displacement axial flow piston pumps,gearpumps,vane pumps.
  • Dismantling & Assembly of Hydraulic cylinders.

Education

West Bengal University of Technology

B.Tech from Mechanical Engineering
01-2019

University Overview

Entrance Mode : JELET (Ranking -500)

MBC Institute of Engg & Tech
Burdwan

Diploma from Mechanical
01-2007

University Overview

Entrance Mode : JEE Entrance Exam

West council of higher secondary education

Higher Secondary (10 + 2)
01-2003

ICSE

Secondary (10th)
01-2001

Skills

MS OFFICE : Advance Excel Word Powerpoint

SAP

Cost analysis and savings

Operations management

Performance improvements

Interests

Listening Music, Reading motivational stories.

Timeline

Deputy Manager-TBM

AFCONS INFRASTRUCTURE LTD
04.2023 - Current

P&M In charge -TBM

AHMEDABAD METRO
02.2022 - 04.2023

Sr. Engg Mechanical

MUMBAI PUNE EXPRESSWAY LINK PROJECT
07.2019 - 02.2022

Mechanical Engineer

AHMEDABAD IHETRO PROJECT
01.2018 - 07.2019

Mechanical Engineer

CHENNAI METRO PROJECT
08.2016 - 01.2018

MECHANICAL ENGINEER

HINDUSTAN CONSTRUCTION COMPANY LIMITED
02.2014 - 08.2015

MECHANICAL ENGINEER

MAROSHI RUPAREL TUNNEL PROJECT, SANTACRUZ, MUMBAI
03.2010 - 02.2014

JUNIOR ENGINEER

TEESTA LOW DAM HYDROELECTRIC PROJECT — IV, KALIJHORA, WEST BENGAL.
05.2008 - 02.2010

TRAINEE ENGINEER

TARA PLANT & EQUIPMENT WORKSHOP, MUMBAI
11.2007 - 04.2008

ICSE

Secondary (10th)

West council of higher secondary education

Higher Secondary (10 + 2)

MBC Institute of Engg & Tech

Diploma from Mechanical

West Bengal University of Technology

B.Tech from Mechanical Engineering

Training

  • 6Days workshop on Hydraulics at Mumbai, Powai conducted by INTERNATIONAL MARITIME TRAINING CENTRE
  • 5 days training on sap (ETM/PP/PM)

Disclaimer

I hereby declare that the details given above are true to the best of my knowledge.

Section name

  • DATE OF BIRTH — 05-10-1984
  • MARTIAL STATUS - Married + 02 Child
  • 17 Lacks.
MUKESH KUMAR AGARWAL