Summary
Overview
Work History
Education
Skills
Personal Information
Languages
Projects
Special Achievements
Executive Profile
Timeline
Generic

PANKAJ KUMAR AGARWAL

Navi Mumbai

Summary

Dynamic logistics leader with extensive experience at JSW Steel Limited, specializing in project management and stakeholder engagement.

Overview

17
17
years of professional experience

Work History

DGM (Deputy General Manager)

JSW Steel Limited
10.2022 - Current
  • Oversaw transport, freight, and rail management for Central Logistics Planning at JSW Dolvi Works.
  • Executed planning and monitoring of delivery orders to enhance turnaround time.
  • Implemented freight project strategies to optimize logistics operations.
  • Conceptualized and executed Project SAMPARK to improve efficiency.
  • Developed and executed idle freight and demurrage reduction initiatives.
  • Coordinated multi-mode dispatches to streamline logistical processes.
  • Prepared comprehensive road and rail dispatch plans for effective execution.

AGM (Assistant General Manager)

JSW Steel Limited
10.2021 - 10.2022
  • Managed end-to-end logistics projects from conceptualization to execution, ensuring seamless progress monitoring and site management.
  • Conceptualized new CSP plant (4.5 MTPA), finalizing layout and technical specifications.
  • Executed project engineering, including installation, commissioning, and testing of equipment.
  • Verified and validated project layout and equipment, ensuring compliance with environmental conditions.
  • Prepared bid invitation documents, detailing specifications, requirements, and BOQ for technical evaluations.
  • Oversaw coil yard management and track laying for 5 MTPA and 10 MTPA to facilitate rail transport of materials.

Manager

JSW Steel Limited
04.2018 - 09.2021
  • Managed end-to-end projects for Settling Tank and Mill Revamping, overseeing all phases from concept to execution.
  • Coordinated procurement of machinery and equipment by preparing schedules based on orders and resource needs.
  • Maintained and reviewed contracts and supplier documents, ensuring proper handling of all contractual obligations.
  • Implemented high-level safety standards in the plant, ensuring safe job execution across all operations.
  • Facilitated Just in Time material availability by coordinating with purchasers and suppliers at project sites.
  • Oversaw material management from ordering through dispatch to site receipt, ensuring timely deliveries.
  • Collaborated with Engineering Consultants on pre-bid engineering, including material take-offs and method statements.

Various Role in CSP Caster

JSW Steel Limited
07.2008 - 04.2018
  • Managing end-to-end projects of Caster. Major Projects of Ladle Turret Bearing Replacement, Caster Revamping (Capacity Enhancement), EMBR Installation and other Capex Projects.
  • Establishing and building strong relations with key stakeholders for seamless working; delivering active functional support related to the formulation of production schedules, administration of manufacturing processes, health & safety management, and production levels.
  • Material Planning and inventory control.
  • Handling Shift Activities as a Shift Incharge.
  • Operated casting machines to produce steel components efficiently.

Education

B.E. - Mechanical

M.B.M Engineering College
Jodhpur
01.2008

Skills

  • Logistics Management
  • Troubleshooting / Root Cause Analysis
  • Budgeting & Cost Control
  • Resource/ Safety Management
  • Contract management
  • Project Planning & Management
  • Client/ Stakeholder Management
  • Procurement/ Vendor Management
  • Erection and commissioning
  • Quality Assurance & Control
  • SAP (MM/ PM module)
  • MS Office Suite

Personal Information

Date of Birth: 06/06/83

Languages

  • English
  • Hindi

Projects

Multi Model Dispatches, Implemented freight project for reduction in freight by Multi Model Dispatches (Road-Rail-Road) and Road-Sea-Road., Approx. 50 Cr, 2022-2023 10 MTPA Logistics Project, Project is taken to enhance Railway infrastructure inside the plant., Approx. 200 Cr, 2021-2022 CSP Mill Revamping, Project was taken to increase the F-1 stand torque to increase the Thin gauges., Approx. 57 Cr, 2017-2019

Special Achievements

  • Successfully completed 'Future Fit Leaders' Programme at ISB, Hyderabad.
  • Successfully completed 'Accelerated Leaders' Programme at IIM, Bangalore.
  • Awarded Excellence award by JSW Steel for Successful Commissioning of Project.
  • Trained Six Sigma Black belt.
  • Developed Multi – Mode Dispatches in Dolvi.

Executive Profile

Result oriented professional, offering nearly 17 years of experience in managing the entire plant Logistics activities along with managing large scale logistics and Mechanical Projects in Steel Industry., Supply Chain & Logistics, Planning & Execution of Logistics Projects, Governance, Negotiation, SAP ERP, Continuous Improvement, MIS, Material Planning, Troubleshooting/Root Cause Analysis, Budgeting & Cost Control, Resource/Safety Management, Contract Management, Project Planning & Management, Client/Stakeholder Management, Procurement/Vendor Management, Erection and Commissioning, Quality Assurance & Control, Certified Black Belt Trained Executive, Leadership, Team Management, Communication

Timeline

DGM (Deputy General Manager)

JSW Steel Limited
10.2022 - Current

AGM (Assistant General Manager)

JSW Steel Limited
10.2021 - 10.2022

Manager

JSW Steel Limited
04.2018 - 09.2021

Various Role in CSP Caster

JSW Steel Limited
07.2008 - 04.2018

B.E. - Mechanical

M.B.M Engineering College
PANKAJ KUMAR AGARWAL