Summary
Overview
Work History
Education
Skills
Date of birth
Current CTC
Notice period
Emerson deltav DCS projects
reading books
Timeline
Generic
PARADA SAI BABU

PARADA SAI BABU

shift incharge - utility (CPP)
Vishakapatnam

Summary

Having 6.5 years of experience in power plant operation and maintenance, commissioning, BOE certified, certified Energy manager and Energy auditor.

Overview

6
6
years of professional experience
8
8
years of post-secondary education
3
3
Languages

Work History

Assistant Manager (Captive Power Plant)

Philips Carbon Black Limited
kochi
11.2021 - Current
  • Production of budgeted steam and power .
  • Planning and implementing actions for routine and emergency operation, start up and shutdown of equipment in coordination with CPP Head
  • To assist CPP Head for developing / updating SOPs for normal and emergency handling and ensuring effective training to all team members
  • Monitoring and managing all transactions required for power sale timely and effectively & to minimize UI charges
  • Maintaining equipment reliability, and efficiency
  • Safety of plant and peoples
  • Quality of water and steam
  • Compliance to IBR rules

DCS Engineer

The India cements Ltd
Miryala Guda
02.2020 - 10.2021
  • 50MW captive power plant.
  • Two 210 TPH IR-CFBC boilers.
  • 50MW extraction cum condensing turbine, make BHEL, with air cooled condenser make Thermax SPX Ltd

DCS Engineer

Steel Exchange India Ltd
Vizianagaram
05.2017 - 02.2020
  • 2X30MW thermal power plant
  • 210 TPH, IR-CFBC boiler, make Thermax India Pvt Ltd
  • 2X36 TPH, WHR boilers, make Thermal systems India Pvt Ltd
  • 2X30 MW multi stages, multi extraction cum condensing turbine make Siemens Ltd
  • With air cooled condenser make GEI ltd

Education

PGDC - Thermal Powerplant Engineering

NPTI
Nagpur
09.2015 - 09.2016

B.Tech - Electrical And Electronics Engineering

JNTU Kakinada
Kakinada
03.2009 - 03.2013

Intermediate - Maths,Physics ,Chemistry.

Sri GCSR Junior College
Rajam
03.2007 - 03.2009

SSC -

Andhra Pradesh State Board
Palakonda
03.2006 - 03.2007

Skills

Decision-Making

undefined

Date of birth

03 /jul/1992

Current CTC

7 LPA

Notice period

2 months

Emerson deltav DCS projects

1. DCS Commissioning of 7 MW Captive powerplant in PCBL kochi. 

2. yokogawa to emerson deltav DCS migration in PCBL kochi.


reading books

like to read personal development books.

Timeline

Assistant Manager (Captive Power Plant)

Philips Carbon Black Limited
11.2021 - Current

DCS Engineer

The India cements Ltd
02.2020 - 10.2021

DCS Engineer

Steel Exchange India Ltd
05.2017 - 02.2020

PGDC - Thermal Powerplant Engineering

NPTI
09.2015 - 09.2016

B.Tech - Electrical And Electronics Engineering

JNTU Kakinada
03.2009 - 03.2013

Intermediate - Maths,Physics ,Chemistry.

Sri GCSR Junior College
03.2007 - 03.2009

SSC -

Andhra Pradesh State Board
03.2006 - 03.2007
PARADA SAI BABUshift incharge - utility (CPP)