Prasad Magdum

Prasad Magdum

Civil Engineer
Mumbai,Maharashtra

Summary

A competent professional with 13+ years of experience In Execution, Project PlannIng & MonitorIng, Scheduling, Co-ordination & Execution. Skilled in managing project activities from initialization to execution including drawings, technical specifications, stage inspections, progress monitoring, manpower planning, material management, and equipment management etc. in co-ordination with Site and HO management. Expertise in Planning and executing construction projects with a flair for Value Engineering, adopting modern construction methodologies, in compliance with quality standards and using Auto CAD, MS Project & Primavera (P6). Excellent relationship management, analytical and negotiation skills with expertise in swiftly ramping up project work in co-ordination with clients, contractors and consultants.

Overview

13
13
years of professional experience
17
17
years of post-secondary education
3
3
Languages

Work History

Engineer Execution, Planning - Monitoring & Coordination

AFCONS Infrastructure Ltd.
Mumbai
7 2011 - Current
  • Reporting to PM, Vice President and Executive Technical Director
  • Optimized engineering processes by implementing innovative solutions and streamlining workflow.
  • Resolved critical issues during system integration phases, ensuring seamless transitions between design iterations.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Developed planning criteria for integrating and enabling new technologies.
  • Coordinated cross-functional efforts to successfully implement new technologies into existing systems.
  • Captured technical schematics for use in project planning and execution.
  • Improved team productivity by providing technical guidance and mentoring junior engineers
  • Achieved successful project outcomes by maintaining accurate documentation and meeting strict deadlines

Manager (Planning and Monitoring): Core Methods and Engineering Group

Afcons Infrastructure Ltd.
Mumbai
2023.04 - Current
  • Projects: DMRC DC07 underground Metro project, Bullet Train HSR C2 package, Bangalore Underground project
  • Maximized performance by monitoring daily activities.
  • Accomplished multiple tasks within established timeframes.
  • Controlled costs to keep business operating within budget and increase profits.
  • Monthly Review of Projects Performance with respect to Plan; Identification of Critical Activities - present & foreseeable as early warning; Methodology & Sequence adopted through BIM.
  • Supporting Project teams with development of typical Construction methods and schemes
  • Review of schedule, resources and carrying out sensitivity analysis on key activities / resources for presenting it to CMEG / Management.
  • Preparation of Detailed work program for project in Primavera P6.
  • Assisting Site Planning team in preparation of EOT / Impact Schedules.
  • Review of Schedule and Resources feasibility, methodology and suggest economic construction methodology solutions.

Senior Engineer (Planning & Execution)

AFCONS Infrastructure Ltd.
Mumbai
2019.10 - 2023.04

Project: Mumbai Metro Line 5 Rail Project

  • Time cycle analysis of major construction activities.
  • Prepared program keeping in view key dates for various structures and contractual requirement of client.
  • Work out Construction Schemes and Preparation of Method Statements.
  • Prepared strip chart for project alignment
  • Prepared baseline Schedule for project.
  • Equipment planning for various job activities.
  • Prepared narrative statement for detailed work program.

Senior Engineer (Planning & Execution)

AFCONS Infrastructure Ltd.
Mumbai
2014.07 - 2019.09
  • Project: Design & Construction of Special Bridge across river Chenab for Udhampur- Srinagar-Baramulla Rail Link Project, Jammu, J & K
  • Developed comprehensive project plans, outlining scopes, timelines, deliverables, and milestones.
  • Kept projects on schedule by managing deadlines and adjusting workflows.
  • Prepared meeting agendas and minutes for distribution and record keeping.
  • Coordinated cross-functional teams to achieve seamless collaboration in achieving project objectives.
  • Collaborated with stakeholders to define clear project goals, leading to consistent alignment with expectations throughout process.
  • Identified potential risks and developed mitigation strategies to minimize disruptions to project timelines.

Senior Engineer (Planning & Execution)

AFCONS Infrastructure Ltd.
Dahej
2011.07 - 2014.06
  • Project: EPCC for Marine Facilities for Dahej Standby Jetty Project, Gujarat
  • Construction of pile foundation (Friction resistance) for Approach trestle and Mooring Dolphin, berthing dolphins and Unloading platform.
  • Construction of Mooring dolphin and berthing dolphin with Pre-casted Slabs and Walls, after carrying out in situ Concrete with fixing of reinforcement with help of studs inside already installed steel pile.
  • Construction of approach trestle construction (2.5 km approach road having 10 m width) which involves Erection of capping beams, roadway beams and pre-cast slabs. Also, In-situ concreting of slab joints along with reinforcement.
  • Erection and Placing of Capping beam and Roadway beams with help of 300 Ton capacity crane which was placed on Traveling Unit (Moving Platform having wheels which can do to and from movement for placing of beams and slabs) to complete Approach Trestle work.
  • Construction of abutment of jetty which involves installation of 6 steel piles along with pile cap with reinforcement and construction of Retaining wall for abutment. Earth filling for abutment along with proper compaction of soil.

Education

EPGPM-Project Management - Project Management

National Institute of Construction Management & Research (NICMAR)
Pune, Maharashtra
2015.06 - 2016.07

B.Tech. (Civil Engineering) - Civil Engineering

Walchand College of Engineering
Sangli, Maharashtra
2008.06 - 2011.05

Diploma (Civil Engineering) - Civil Engineering

Government Polytechnic
Kolhapur, Maharashtra
2008.05 - 2011.05

SSC -

Maharashtra State Board of Secondary Board Pune
Pune, Maharashtra
1995.06 - 2005.06

Skills

SAP

Accomplishments

  • Received Star performer of the year 6 times in last 7 years at Afcons
  • Got appreciation prize as a best engineer from the company for safe execution of construction work in 2013.
  • Secured 3rd in order of merit in final examination of diploma in civil engineering program held in year of 2008.


Timeline

Manager (Planning and Monitoring): Core Methods and Engineering Group

Afcons Infrastructure Ltd.
2023.04 - Current

Senior Engineer (Planning & Execution)

AFCONS Infrastructure Ltd.
2019.10 - 2023.04

EPGPM-Project Management - Project Management

National Institute of Construction Management & Research (NICMAR)
2015.06 - 2016.07

Senior Engineer (Planning & Execution)

AFCONS Infrastructure Ltd.
2014.07 - 2019.09

Senior Engineer (Planning & Execution)

AFCONS Infrastructure Ltd.
2011.07 - 2014.06

B.Tech. (Civil Engineering) - Civil Engineering

Walchand College of Engineering
2008.06 - 2011.05

Diploma (Civil Engineering) - Civil Engineering

Government Polytechnic
2008.05 - 2011.05

SSC -

Maharashtra State Board of Secondary Board Pune
1995.06 - 2005.06

Engineer Execution, Planning - Monitoring & Coordination

AFCONS Infrastructure Ltd.
7 2011 - Current

Age

34 Years

Personal Information

  • Passport Number: L6362212
  • Date of Birth: 09/30/1989
  • Marital Status: Married

Currentproject

Monthly Review of Projects Performance w.r.t Plan; Identification of Critical Activities - present & foreseeable as early warning;

Methodology & Sequence adopted through BIM., Collation, Review & analysis of Data on monthly basis and to include the analysis as part of Project Health Review., Supporting Project teams with development of typical Construction methods and schemes.,

Review of schedule, resources and carrying out sensitivity analysis on key activities / resources for presenting it to CMEG / Management.,

Preparation of the Detailed work program for the project in Primavera P6.,

Assisting the Site Planning team in the preparation of EOT / Impact Schedules.,

Review of Schedule and Resources feasibility, methodology and suggest economic construction methodology solutions.,

Providing support to Tech Training team as Expert facilitators for ABC Activities.,

Evaluation & Mapping of Skill Sets of Planning Engineers at HO and Project Sites.,

Identifying the potential candidates and imparting technical skills training, including Primavera, to them.,

Review the Pre-start Planning and Budgets of the Projects., Review and support the BU team for the preparation of the CAPEX., Cross Verify the Resources Allocation and Movement considering the Project Schedule.

Previousprojects

1. Mumbai Metro Line 5 Rail Project, Senior Engineer (Planning & Execution)

The scope of work involves Elevated viaduct and seven (7) Elevated stations (excluding architectural finishes and PEB roof structure) including Dismantling of existing Dhamankar Naka flyover (Excluding Ramp) and reconstruction of the same in two-tier system in which the flyover shall be at level-1 and metro station shall be at level.

  • Time cycle analysis of major construction activities.
  • Prepared program keeping in view key dates for various structures and contractual requirement of the client.
  • Work out Construction Schemes and Preparation of Method Statements.
  • Prepared strip chart for the project alignment.
  • Prepared baseline Schedule for the project.
  • Equipment planning for the various job activities.
  • Prepared narrative statement for the detailed work program.


2.Design & Construction of Special Bridge across river Chenab for Udhampur- Srinagar-Baramulla Rail Link Project, Jammu, J & K,

  • It will be the world's highest railway bridge after completion., Construction of Arch structure by using World's heaviest cable crane., Viaduct deck erection by Incremental launching method on transition and circular curve for first time in world.,
  • Preparation and updation of Schedule/Work programs.,
  • Preparation and updation of Budget.,
  • Tracking physical and financial progress as compared to original plan and preparing/checking the reports (DPR, QM 13, and Turnover Statement & MIS).,
  • Conducting Progress review meetings (On Daily, Weekly and Monthly basis) – On theme of Last Planner System (Lean Construction Technique).,
  • Cost monitoring of major construction activities and performance monitoring of associated equipment., Assisting/Coordinating with Project Controller on various Technical and Commercial issues and correspondence with site team.,
  • Coordination with Engineer/Employers at Site for various technical and commercial issues.,
  • Checking of Engineering/Structural drawings, Shuttering drawings & Installation works drawings and co-ordination with designers for design and drawing related issues.,
  • Work out Construction Schemes and Preparation of Method Statements in co-ordination with Experts, Design Team and Site Management.



3. EPCC for Marine Facilities for Dahej Standby Jetty Project, Gujarat, Engineer – Site Execution,

  • The scope of work comprises of Design, engineering, procurement, construction, installation, and commissioning assistance of all equipment /facilities for standby jetty.,
  • Construction of pile foundation (Friction resistance) for Approach trestle and Mooring Dolphin, berthing dolphins and Unloading platform.,
  • Construction of Mooring dolphin and berthing dolphin with Pre casted Slabs and Walls, the after carrying out in situ Concrete with fixing of reinforcement with help of studs inside already installed steel pile.,
  • Construction of approach trestle construction (2.5 km approach road having 10 m width) which involves Erection of capping beams, roadway beams and pre-cast slabs. Also, In-situ concreting of slab joints along with reinforcement.,
  • Erection and Placing of Capping beam and Roadway beams with help of 300 Ton capacity crane which was placed on Traveling Unit (Moving Platform having wheels which can do to and from movement for the placing of beams and slabs) to complete Approach Trestle work.,
  • Construction of abutment of jetty which involves installation of 6 steel piles along with pile cap with reinforcement and construction of Retaining wall for abutment. Earth filling for abutment along with proper compaction of soil.

Academicprojectsseminars

  • Post Graduation: Lean Construction for Infrastructure Project.
  • B.Tech project Stabilizations of black cotton soil for sub grade of road pavement.
  • B.Tech Seminar Cracks in structure.
  • Polytechnic project Planning for rural development.
  • Polytechnic seminar Construction of Concrete Road Pavement by Vacuum Dewatering Method.

Extracurricular Activities

Received Star performer of the year 5 times in last 6 years at Afcons. Got appreciation prize as a best engineer from the company for safe execution of construction work in 2013. Secured 3rd in order of merit in final examination of diploma in civil engineering program held in year of 2008.

Disclaimer

I agree and declare all my particulars stated above are written with complete consciousness and will provide sufficient justification with valid & attested original documents.

Age

34 Years

Personal Information

  • Passport Number: L6362212
  • Date of Birth: 09/30/1989
  • Marital Status: Married

Currentproject

Monthly Review of Projects Performance w.r.t Plan; Identification of Critical Activities - present & foreseeable as early warning;

Methodology & Sequence adopted through BIM., Collation, Review & analysis of Data on monthly basis and to include the analysis as part of Project Health Review., Supporting Project teams with development of typical Construction methods and schemes.,

Review of schedule, resources and carrying out sensitivity analysis on key activities / resources for presenting it to CMEG / Management.,

Preparation of the Detailed work program for the project in Primavera P6.,

Assisting the Site Planning team in the preparation of EOT / Impact Schedules.,

Review of Schedule and Resources feasibility, methodology and suggest economic construction methodology solutions.,

Providing support to Tech Training team as Expert facilitators for ABC Activities.,

Evaluation & Mapping of Skill Sets of Planning Engineers at HO and Project Sites.,

Identifying the potential candidates and imparting technical skills training, including Primavera, to them.,

Review the Pre-start Planning and Budgets of the Projects., Review and support the BU team for the preparation of the CAPEX., Cross Verify the Resources Allocation and Movement considering the Project Schedule.

Previousprojects

1. Mumbai Metro Line 5 Rail Project, Senior Engineer (Planning & Execution)

The scope of work involves Elevated viaduct and seven (7) Elevated stations (excluding architectural finishes and PEB roof structure) including Dismantling of existing Dhamankar Naka flyover (Excluding Ramp) and reconstruction of the same in two-tier system in which the flyover shall be at level-1 and metro station shall be at level.

  • Time cycle analysis of major construction activities.
  • Prepared program keeping in view key dates for various structures and contractual requirement of the client.
  • Work out Construction Schemes and Preparation of Method Statements.
  • Prepared strip chart for the project alignment.
  • Prepared baseline Schedule for the project.
  • Equipment planning for the various job activities.
  • Prepared narrative statement for the detailed work program.


2.Design & Construction of Special Bridge across river Chenab for Udhampur- Srinagar-Baramulla Rail Link Project, Jammu, J & K,

  • It will be the world's highest railway bridge after completion., Construction of Arch structure by using World's heaviest cable crane., Viaduct deck erection by Incremental launching method on transition and circular curve for first time in world.,
  • Preparation and updation of Schedule/Work programs.,
  • Preparation and updation of Budget.,
  • Tracking physical and financial progress as compared to original plan and preparing/checking the reports (DPR, QM 13, and Turnover Statement & MIS).,
  • Conducting Progress review meetings (On Daily, Weekly and Monthly basis) – On theme of Last Planner System (Lean Construction Technique).,
  • Cost monitoring of major construction activities and performance monitoring of associated equipment., Assisting/Coordinating with Project Controller on various Technical and Commercial issues and correspondence with site team.,
  • Coordination with Engineer/Employers at Site for various technical and commercial issues.,
  • Checking of Engineering/Structural drawings, Shuttering drawings & Installation works drawings and co-ordination with designers for design and drawing related issues.,
  • Work out Construction Schemes and Preparation of Method Statements in co-ordination with Experts, Design Team and Site Management.



3. EPCC for Marine Facilities for Dahej Standby Jetty Project, Gujarat, Engineer – Site Execution,

  • The scope of work comprises of Design, engineering, procurement, construction, installation, and commissioning assistance of all equipment /facilities for standby jetty.,
  • Construction of pile foundation (Friction resistance) for Approach trestle and Mooring Dolphin, berthing dolphins and Unloading platform.,
  • Construction of Mooring dolphin and berthing dolphin with Pre casted Slabs and Walls, the after carrying out in situ Concrete with fixing of reinforcement with help of studs inside already installed steel pile.,
  • Construction of approach trestle construction (2.5 km approach road having 10 m width) which involves Erection of capping beams, roadway beams and pre-cast slabs. Also, In-situ concreting of slab joints along with reinforcement.,
  • Erection and Placing of Capping beam and Roadway beams with help of 300 Ton capacity crane which was placed on Traveling Unit (Moving Platform having wheels which can do to and from movement for the placing of beams and slabs) to complete Approach Trestle work.,
  • Construction of abutment of jetty which involves installation of 6 steel piles along with pile cap with reinforcement and construction of Retaining wall for abutment. Earth filling for abutment along with proper compaction of soil.

Academicprojectsseminars

  • Post Graduation: Lean Construction for Infrastructure Project.
  • B.Tech project Stabilizations of black cotton soil for sub grade of road pavement.
  • B.Tech Seminar Cracks in structure.
  • Polytechnic project Planning for rural development.
  • Polytechnic seminar Construction of Concrete Road Pavement by Vacuum Dewatering Method.

Extracurricular Activities

Received Star performer of the year 5 times in last 6 years at Afcons. Got appreciation prize as a best engineer from the company for safe execution of construction work in 2013. Secured 3rd in order of merit in final examination of diploma in civil engineering program held in year of 2008.

Disclaimer

I agree and declare all my particulars stated above are written with complete consciousness and will provide sufficient justification with valid & attested original documents.
Prasad MagdumCivil Engineer