Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic

PRASHANT KUMAR

Summary

Experienced Piping Design and Engineering professional with over 20 years of industry experience. Worked on a variety of Petrochemicals, Refinery, LNG terminals, Utilities & Offsites, Chemical & Offshore projects. Extensive knowledge of industry codes and standards such as API, ASME, ASTM, ANSI, and ADNOC. Currently serving as a Lead Piping Engineer overseeing Material, Layout & Stress activities. Skilled in project implementation across various stages including Concept, FEED/Basic Engineering, Detailed Engineering, EPCM, EPC / LSTK, and PMC.

Overview

21
21
years of professional experience

Work History

Lead Piping Engineer

Engineers India Limited
New delhi
01.2024 - 12.2024
  • Review and approval of contractor drawing/documents of LNG storage tanks
  • BOG compressor and flare system

Lead Piping Engineer

Engineers India Limited
New delhi
01.2024 - 12.2024
  • Utility package scope drawings and SOW input for LP/HP AIR COMPRESSOR, AIR DRYER, PSA NITROGEN PACKAGE, CRYOGENIC NITROGEN PACKAGE, COOLING TOWER AND CHEMICAL DOSING PACKAGE
  • PMS/VMS checking
  • Checking of piping MTO
  • Preparation of Composite tender
  • E3D modeling supervision
  • Coordination with other disciplines

Lead Piping Engineer

Engineers India Limited
New delhi
01.2024 - 12.2024
  • Feasibility check for new piping corridor and checking of piping layout studies
  • Checking of piping mto
  • Preparation of composite tender

Piping Engineer

Engineers India Limited
Abu Dhabi
01.2023 - 12.2024
  • Visited site for Identification of plot for BPST
  • Plot plan option study
  • Feasibility check and report for new piping corridor and checking of piping layout studies
  • Checking of Tie-in schedule
  • Preparation of Early tie-in package
  • Participation in alignment meetings and various workshops like plot plan selection, design review workshop etc

Lead Piping Engineer

Engineers India Limited
Abu Dhabi
01.2023 - 12.2023
  • Finalization of Plot plans
  • Checking of addendum to existing specifications & valve data sheets
  • Planning & checking of piping GA drawings (construction & demolition)
  • Identification of tie-in location and checking of tie-in schedule
  • Preparation of Tie-in package
  • Isometrics, support schedule & Material take-off checking and timely submission as per schedule
  • Stress report review & submission/approval from ADNOC as per schedule
  • Civil/Structural coordination and ensured timely input
  • Participated in Review Meetings/HAZOP/HAZID/CONSTRUCTABILITY workshops with Company
  • Zirku Site visit for data collection

Lead Piping Engineer

Engineers India Limited
Abu Dhabi
01.2022 - 12.2022
  • Piping GA drawings (construction & demolition)
  • Identification of tie-in location and preparation of tie-in schedule, Material take-off, Isometrics & support schedule

Piping Engineer

Engineers India Limited
Abu Dhabi
01.2022 - 12.2022
  • As a Piping engineer, I was involved in finalization of Piping GA drawings (construction & demolition), Identification of tie-in location and preparation of tie-in schedule, Material take-off, Isometrics & support schedule
  • Also visited Zirku Island for data collection

Lead Piping Engineer

Engineers India Limited
Abu Dhabi
01.2021 - 12.2022
  • The project objective was to upgrade the existing Produced Water System (PWT) facilities from 200 MBD to 300 MBD capacity located at ETI & ASI to cater for the Produced Water demand until the year 2029
  • Work was related to Separators, PWT package module, PW disposal pump, PW disposal well, Xmas tree tie-ins and related well pad area piping
  • Main activities were- Checking and finalization of plot plan for new equipments like ejector package, PWT pumps, dosing skids etc
  • Checking Piping GA drawings (construction & demolition)
  • Identification of tie-in location and checking of tie-in schedule and package
  • SP item list, Mechanical Handling Report, Material take-off, stress analysis, Isometrics & supports
  • Stress report review & submission/approval from ADNOC as per schedule
  • Civil/Structural coordination and ensured timely input
  • Participated in Review Meetings/HAZOP/HAZID/CONSTRUCTABILITY with Company
  • Visited Ettouk and Asseifiya Island for verification & data collection

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
Nigeria
01.2020 - 12.2021
  • As a lead Piping engineer, I was leading in Equipment & piping layout finalization, also involved in 3D modeling supervision

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
Nigeria
01.2018 - 12.2020
  • As a Lead Piping engineer, I was responsible for review and approval of piping documents submitted by EPC contractors of various packages/units- Flare stack package, Effluent treatment package, RO-DM- CPU package, Raw water treatment package (RWTP), Compressed air & N2 package, and Cooling tower package (5nos)
  • Following are main piping documents reviewed and approved- Piping & Valve material specifications, Equipment & piping layouts, Stress analysis reports, Isometrics & support drawings, SP item data sheet and drawings
  • Also Participated in 3D model review with vendors along with client

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
Nigeria
01.2016 - 12.2018
  • As a Lead Piping engineer, I was responsible for piping engineering works such as- Battery limit coordination with various units like-CDU, RFCC, HGU, PPU, CPP, MHC etc
  • And package vendors like Flare stack package, ETP, RODM, RWTP, N2 and 30 nos of substations
  • MTO checking & control
  • Preparation of inputs for mechanical tender
  • Checking of stress analysis reports, Isometrics & supports
  • Review of vendor drawings
  • 3D modeling supervision & 30%,60% & 90% workshops with client
  • Civil/Structural coordination and timely input
  • Review of interdisciplinary documents like P&ID, Line List, Instrumentation Hook-up Drawings and Equipment data sheets etc
  • Support to engineers and designers for various piping aspects to meet project schedule
  • Site query resolution

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
Nigeria
01.2015 - 12.2016
  • As a Lead Piping engineer, I was responsible for piping engineering works such as equipment & piping layouts, Material take-off, preparation of material and purchase requisitions, technical evaluation of offers, preparation of bid analysis, preparation of inputs for mechanical tender, stress analysis report review, Isometrics & supports drawing checking, review of vendor drawings, 3D modeling supervision & site query resolution

Piping layout Engineer

BPCL
Mumbai
01.2012 - 12.2015
  • As a Piping Engineer I was involved in Equipment layout/area plot plan and piping studies, tie-in schedule/drawings, Material take-off, Preparation of material and purchase requisitions including cladded piping, tendering activities, coordination with Stress group and vendors for piping systems like columns, pumps, reboilers, heaters, exchangers, vessels, ejector package, cladded piping spools, UG network etc
  • Checking of support marking on isometrics and GADs, checking of tie-In points, 3D modeling supervision & site query resolution

Piping layout Engineer

MANGALORE REFINERY & PETROCHEMICALS LTD
01.2010 - 12.2012
  • As a Piping layout Engineer I was involved in Plot plan/area plot plan/equipment layout and piping corridor finalization, piping studies, tie-in schedules
  • Also involved in Stress coordination of all piping systems, Support marking on isometrics and GADs, Material take-off, Preparation of material and purchase requisitions, technical evaluation of offers, preparation of bid analysis, preparation package inputs, Review of vendor drawings, Preparation of clip drawings, IBR Package, Steam tracing drawings, Field engineering

Piping Engineer

NUMALIGARH REFINERIES LTD.
01.2009 - 12.2009
  • As a Piping Engineer I was involved in brownfield job of various refinery units like CDU, HGU, HCU and offsites etc
  • Stress analysis of all piping systems like columns, pumps, reboilers, heaters, turbines, exchangers, vessels etc
  • Support marking on isometrics and GADs, Material take-off, Preparation of material and purchase requisitions, technical bid analysis, Review of vendor drawings, Coordination with other Engineering disciplines

Piping Engineer

INDIAN OIL CORPORATION LTD.
01.2007 - 12.2009
  • As a Piping Engineer I was involved in Stress analysis of all piping systems like columns, pumps, reboilers, heaters, turbines, exchangers, vessels etc
  • Support marking on isometrics and GADs, Material take-off, Preparation of material and purchase requisitions, Technical bid analysis, Review of vendor drawings, Coordination with other Engineering disciplines

Piping Engineer

SOLARIS CHEMTECH LTD.
01.2006 - 12.2007
  • As an Engineer I was responsible for piping MTO, rack piping corridor finalization, IBR Package
  • Also involved in field engineering and coordination with other engineering disciplines

Piping Engineer

PFIZER India
01.2006 - 12.2006
  • As an Engineer worked for the +/- 30% costing of API Pilot Plant
  • Involved in conceptual Piping layout, Fire hydrant and sprinkler layout, Equipment layout of Solvent storage area and Piping MTO

Piping Engineer

INDIA GLYCOLS LIMITED
01.2005 - 12.2006
  • As a team member involved in detail piping engineering activities like checking of Isometric Drawings, support marking, Piping MTO, Rack piping coordination and Stress analysis using CAESAR software

Piping Engineer

TORRENT PHARMACEUTICALS LTD
01.2004 - 12.2005
  • As a piping design engineer involved in detail piping engineering activities like preparation of piping material specification, piping MTO, piping MRs and checking of piping isometrics, Support marking etc

Education

Degree in Engineering - Mechanical

V.T.U
Karnataka

Skills

  • Layout Development
  • Design Modification Recommendation
  • Technical Drawings
  • Decision-Making
  • AutoCAD
  • Employee Management
  • Multitasking
  • Problem-solving aptitude
  • Materials Specifications
  • Process Improvement
  • Self Motivation
  • Problem-Solving
  • Task Prioritization
  • Continuous Improvement
  • Problem-solving abilities

Personal Information

Nationality: Indian

Timeline

Lead Piping Engineer

Engineers India Limited
01.2024 - 12.2024

Lead Piping Engineer

Engineers India Limited
01.2024 - 12.2024

Lead Piping Engineer

Engineers India Limited
01.2024 - 12.2024

Piping Engineer

Engineers India Limited
01.2023 - 12.2024

Lead Piping Engineer

Engineers India Limited
01.2023 - 12.2023

Lead Piping Engineer

Engineers India Limited
01.2022 - 12.2022

Piping Engineer

Engineers India Limited
01.2022 - 12.2022

Lead Piping Engineer

Engineers India Limited
01.2021 - 12.2022

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
01.2020 - 12.2021

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
01.2018 - 12.2020

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
01.2016 - 12.2018

Lead Piping Engineer

DANGOTE OIL REFINING COMPANY LIMITED
01.2015 - 12.2016

Piping layout Engineer

BPCL
01.2012 - 12.2015

Piping layout Engineer

MANGALORE REFINERY & PETROCHEMICALS LTD
01.2010 - 12.2012

Piping Engineer

NUMALIGARH REFINERIES LTD.
01.2009 - 12.2009

Piping Engineer

INDIAN OIL CORPORATION LTD.
01.2007 - 12.2009

Piping Engineer

SOLARIS CHEMTECH LTD.
01.2006 - 12.2007

Piping Engineer

PFIZER India
01.2006 - 12.2006

Piping Engineer

INDIA GLYCOLS LIMITED
01.2005 - 12.2006

Piping Engineer

TORRENT PHARMACEUTICALS LTD
01.2004 - 12.2005

Degree in Engineering - Mechanical

V.T.U
PRASHANT KUMAR