Summary
Overview
Work History
Education
Skills
Software
Certification
Interests
Travel Volunteering and community Involvement Sports Yoga
Timeline
Hi, I’m

Priyadarsi Debadatta Das

Mechanical Engineer
Dharwad
Priyadarsi Debadatta Das

Summary

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Production management professional with over 17+ years’ experience in large, fast-paced, multi-line facilities. Proven track record of achieving sustained improvements in quality, cost and delivery functions. Track record devising, evaluating, and implementing continuous process improvements to minimize waste and reduce costs while maximizing quality and yield. Establish effective quality control and safety programs, encouraging proactive participation across the manufacturing floor.

Overview

19
years of professional experience
7
years of post-secondary education
3
Certifications
5
Languages

Work History

Tata Hitachi construction machinery Pvt. Ltd,
Dharwad

Manager PT CED Project
04.2022 - Current

Job overview

  • Involved in Project planning for PT CED new paint line, Starting from DAP ,Project scheduling ,ROI calculation & Project monitoring ,Variable cost calculation, Revenue budgeting, Jig fixture ,hanger designing, material handling system development for parts monitoring, Manpower calculation ,Supporting the project implementing vendor ,Layout mapping
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Demonstrated a high level of initiative and creativity while tackling difficult tasks.
  • Demonstrated strong organizational and time management skills while managing multiple projects.
  • Acted as a team leader in group projects, delegating tasks and providing feedback.

Manager Technical skill
04.2019 - 03.2022

Job overview

  • Skill Gap analysis for work force and preparing training module and scheduling training programs
  • Increased shop floor workforce skill up to 6% from areas like assembly, welding and painting from current skill level 3.57 to 3.88

Tata Hitachi construction machinery Pvt. Ltd
Dharwad

Jr. & AsOperation Maintenance Paint Shop &Shotblas
04.2012 - 03.2019

Job overview

  • · Improved productivity by 5% year by year by reducing SMM of paint shop and shotblast
  • · Reduce variable cost by 10% for paint shop by following RT15 initiatives driven by Hitachi, Japan
  • · Implemented TPM stage #2 & meticulously handle the implementation of ‘Lean Manufacturing’ through modification of cell layout, Visual Management, and Loss time Analysis and do Ergonomic study
  • · Interface with Top Management and CFT for timely resolution of Project bottlenecks and issues.
  • · Reduced & Control inventory level by 15% in finished good & raw material by Implementing Jishuken & Implemented IOT in paint shop and Shotblast to monitor inventory
  • · Was responsible for all Certification and compliance like ISO, OHSHAS, and Hitachi Safety Audit.
  • · Implemented Global Monozukuri system and achieved pass rate of 85% which audit conducted yearly once by HCM, Japan, &Quarterly by our own
  • · Increased Booth St. Pass from 60% to 92% by implementing various method like Why Why analysis, OJT, Rapid skill training, and DOZO set up.


Tata Hitachi construction machinery Pvt. Ltd,
Dharwad, Karnataka

Sr. Engg. Operation & Maintenance Shotblast
07.2008 - 03.2012

Job overview

  • Production and maintenance activity execution
  • Implementation of CLITA, Preventive, Predictive maintenance, monitoring of OEE, MTBF &MTTR
  • Major Projects/Achievements @ Tata Hitachi Construction Machinery Pvt
  • Ltd
  • Selected 2 times for SGA presentation at HCM, Japan
  • Participated in Global inspiration award conducted by Hitachi Global
  • Under gone 2-month trainer program at HCM, Japan to learn Skill training system and international skill competition Procedures
  • Commissioned and Streamlined shot blast shop, paint shop#2, Auxiliary paint booth
  • Honored with 5 times ‘Kamyabi award’ for best Kaizen implementation and 2 times best shop award for safety and 5s in shop floor and TPM serious adoption awards.

Sharda Motor industries limited
Nashik

Sr. Engg Maintenance
03.2008 - 07.2008

Job overview

  • Worked flexible hours across night, weekend and holiday shifts.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Managed and controlled 10 technicians to achieve organization goals and objectives
  • Prepared strategic plans and analyses monthly break down and spare’s part planning
  • Completed installation and commissioning of 10 SPMs across the TATA NANO car line
  • Performed a vital role in execution of projects involving plant layout, utility layout, fabrication & erection of various pipelines for Water, Air, and Gas etc.
  • Coordinated with other team to complete the new project for sanand plant
  • Attended breakdowns (CNC pipe bending, TIG welding, spot welding, CO2 welding. press m/cs)
  • Implemented and planned Poke Yoke

Gabriel India limited, Hosur (Tamandu) & Dewas (MP)
Hosur & Dewas

Engineer Maintenance
03.2004 - 03.2008

Job overview


  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Diagnosed and resolved machine operation variations and equipment problems.
  • Dismantled defective machines and equipment and installed new or repaired parts.
  • Documented maintenance activities and confirmed compliance with relevant regulations.
  • Trained and supervised staff on equipment maintenance and safety procedures.
  • Spare parts management and attaining brake down for various machines like paint shops, SPM welding machines of MIG, TIG, SPOT, Resistance, &press machines.
  • MTTR & MTBF monitoring and CLITA & TPM implementation, Active member for shop floor idea implementation CFT
  • Implemented auto lubrication system in paint shop conveyors.
  • Implemented poke yoke system for marking machine to eliminate unnecessary rejection.
  • · Make a master sheet for all machine spare parts and implemented machine history cards to reduce the Machine downtime
  • · Implemented CLITA for all machines.

Education

Janardan Rai Nagar Rajasthan Vidyapeeth
, Kalinga Engineering, Cuttack

B. Tech from Mechanical Engineering
04.2007 - 04.2010

Kalinga Polytechnic
, Bhubaneswar

Diploma from Mechanical
04.1999 - 03.2002

Foreman Training Institute
, Bangalore

Maintenance Engineering
04.2006 - 09.2006

CTTC
, Bhubaneswar

Advanced Diploma in CNC Programming from CNC Programming, Auto CAD, Solid Work,Master Cam
03.2003 - 08.2003

HCM, Global Training Center
, Japan

Train The Trainer
08.2018 - 10.2018

Skills

Painting & assembly, maintenance process

undefined

Software

SAP

Office 365

Auto cad

Team Center

Certification

PMP

Interests

Travelling,Playing,Exercising

Travel Volunteering and community Involvement Sports Yoga

Pan india Tour,Member of Sports committee at Tata Hitachi

Timeline

Manager PT CED Project

Tata Hitachi construction machinery Pvt. Ltd,
04.2022 - Current

Manager Technical skill

04.2019 - 03.2022

HCM, Global Training Center

Train The Trainer
08.2018 - 10.2018

Jr. & AsOperation Maintenance Paint Shop &Shotblas

Tata Hitachi construction machinery Pvt. Ltd
04.2012 - 03.2019

Sr. Engg. Operation & Maintenance Shotblast

Tata Hitachi construction machinery Pvt. Ltd,
07.2008 - 03.2012

Sr. Engg Maintenance

Sharda Motor industries limited
03.2008 - 07.2008

Janardan Rai Nagar Rajasthan Vidyapeeth

B. Tech from Mechanical Engineering
04.2007 - 04.2010

Foreman Training Institute

Maintenance Engineering
04.2006 - 09.2006

Engineer Maintenance

Gabriel India limited, Hosur (Tamandu) & Dewas (MP)
03.2004 - 03.2008

CTTC

Advanced Diploma in CNC Programming from CNC Programming, Auto CAD, Solid Work,Master Cam
03.2003 - 08.2003

Kalinga Polytechnic

Diploma from Mechanical
04.1999 - 03.2002

PMP

Train the Trainer

Maintenance Engineering

Priyadarsi Debadatta DasMechanical Engineer