Experienced engineer seeking a challenging role in a professional work environment. Eager to contribute my knowledge and skills towards achieving organizational goals. Passionate about continuous learning and growth, I aim to apply my expertise in a dynamic setting that fosters personal and professional development. Committed to leveraging my technical background to drive innovation and make a meaningful impact within the company. Excited about collaborating with like-minded professionals to drive success and achieve mutual goals.
Project Detail:- Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend -Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand
Work Description
Project Detail:- Construction of Two Tunnel, Two tubes of Four lane each (in km 1+040 to km 2+790) 1.75km and km 3+440 to 12+360 (8.92km) for Missing Link under Capacity Augmentation of Mumbai Pune Expressway in the state of Maharashtra Under EPC Mode-Package-I, For the Asias widest tunnel with Excavation diameter of 23.328 mtr.
Work Description
Project Detail:- Project Management and Construction Supervision Consultant (PMC) for Construction of Two-Lane Road Tunnels parallel to existing Dhalli Tunnel including all relevant E&M work Reconstruction of Existing Approach Road and maintenance at Shimla Himachal Pradesh Under Shimla smart City Mission on (EPC) Mode (Package No.-HPRIDCL/DHALLI Tunnel/2021)
Work Description
Project Detail:- Detailed Design and PMC for Construction of Tunnels from Chainage km- 3+500 to km 20+000 for New Single Line BG Rail Link Between Bhanupli- Bilaspur-Beri, in the state of Punjab and Himachal Pradesh.
Work Description
Project Detail:- Four Lanning of Chenani to Nashri section of NH-1A from Km 89+00 to Km130+00 (New Alignment) of NH-1A including 9.2 Km long tunnel (2 Lane) with parallel escape tunnel on BOT (Annuity) basis, in DBFO pattern in the state of Jammu and Kashmir.
Work Description
Project Detail:- Four Lanning of Chenani to Nashri section of NH-1A from Km 89+00 to Km130+00 (New Alignment) of NH-1A including 9.2 Km long tunnel (2 Lane) with parallel escape tunnel on BOT (Annuity) basis, in DBFO pattern in the state of Jammu and Kashmir.
Work Description
Project Detail:- Four Lanning of Chenani to Nashri section of NH-1A from Km 89+00 to Km130+00 (New Alignment) of NH-1A including 9.2 Km long tunnel (2 Lane) with parallel escape tunnel on BOT (Annuity) basis, in DBFO pattern in the state of Jammu and Kashmir.
Work Description
Project Details :- Construction of Tunnel T-77D (Package-T-77D) on Katra - Banihal Section of Udhampur - Srinagar - Baramulla New BG Railway Line Project. Chainage: 146600m to 148463m, Tunnel Length: 1.863 Kms, single track Tunnel including adit tunnel, Diameter:- 9.67 m, Cross sectional Area:- 75.767 Sq.m.
Work Description
MS Office 2007