Mechanical Engineer Having 8 plus Years of Experience in the filed of Power plant Maintenance with a background in Preventive and corrective Maintenance & Erection commissioning .
Overview
8
8
years of professional experience
1
1
Certification
Work History
Senior Executive-Projects
Century Pulp and Paper
Nainital
03.2024 - Current
Initializing the project of a 100 TPH CFBC boiler and a 950 TDS chemical recovery boiler.
Scheduling, procurement, and planning of upcoming projects.
Scheduling planned activities using MS Project.
Engineer Maintenance
Prakash Industries Ltd.
05.2019 - 06.2021
Responsible for day-to-day preventive maintenance and breakdown maintenance of the boiler, steam turbine, and its auxiliaries.
Bearing checking, replacement of bearings, and alignment of the various fans and pumps.
Overhauling various gearboxes and maintaining their preventive maintenance schedule.
Reduction in downtime by effective industrial maintenance practices.
Communicating with the various external agencies during the annual shutdown.
Proper distribution of the manpower, as per the job priority.
Coordinating with vendors for spare inventory maintenance.
Maintenance of boiler feed pumps, gearboxes, ID fans, FD fans, and other mechanical equipment.
Scheduling and planning for the annual shutdown of the boiler.
Senior Officer
Century textile industries Ltd
Bharuch
06.2022 - 03.2024
Handling maintenance of a 37 TPH Thermax make boiler and a 4.9 MW Triveni make steam turbine.
Preparing the schedule for preventive maintenance of the coal handling plant, ash handling plant, boiler feed pump, compressor, and its auxiliary.
Executed on-site revamping of a 4.9 MW condensing turbine to a back-pressure turbine.
All pumps and drives alignment and mechanical seal replacement work.
Bearing inspection and clearance checking.
Senior Executive
Aarti Industries Ltd
Bharuch
12.2021 - 05.2022
Handling the operation and maintenance of a 70 TPH ISGEC make boiler and an 8 MW Siemens make steam turbine.
Prepare the daily generation and maintenance report on SAP.
Shift Incharge
Thermax Ltd
Bharuch
06.2021 - 12.2021
Handling operation and Maintenance of 37TPH Thermax Make AFBC boiler and 4.9 Mw Triveni make turbine .
Preparing Schedule for Preventive maintenance of equipment
Engineer Services
G.N Power Turbo Services Pvt Ltd
07.2016 - 05.2019
Maintenance of 1 MW to 60 MW Back Pressure, Bleed, and Extraction cum condensing turbine have been attempted
It includes dismantling, rotor removing, defective parts replacing after that final running
Installation of Captive Power Plant Turbine Base i.e
Erection and Commissioning of Turbine Generator (TG) Set: Independently erectioned and commissioned many sites established the set for smooth working by attending all teething problem came across
Operation and Maintenance (O&M) of Captive Power Plant during O&M contract
Pre-commissioning and Commissioning of Captive Power Plant involving all the safety tests for maintaining the protection of Turbine and Alternator
Fabrication, Erection And Modification (as per site requirement) of all the related pipings as per Isometric and P& I
Improving the plant availability and equipment reliability by following the established maintenance practice
Generation and execution of preventive maintenance, schedule of rotating and static equipments
Planning of men and material in execution of project completion within time frame
Responsible for timely execution of new projects (all aspects of erection, commissioning & performance trial.)
MECHANICAL ENGINEER at CENTURY PULP AND PAPER(ADITYA BIRLA GROUP OF COMPANY)MECHANICAL ENGINEER at CENTURY PULP AND PAPER(ADITYA BIRLA GROUP OF COMPANY)
Superintendent – Finishing House & Warehouse Dept at Everest Pulp and Paper MillSuperintendent – Finishing House & Warehouse Dept at Everest Pulp and Paper Mill