Summary
Overview
Work History
Education
Skills
Industrial Training
Present responsibilities
Major Highlights
Personal Details
Section name
Timeline
web
SHIV PANDEY

SHIV PANDEY

Lucknow

Summary

Good hand in Electrical, Utility Maintenance & Project.

Overview

21
21
years of professional experience
1
1
Language

Work History

AGM – Electrical

SLMG Beverages Pvt Ltd.
12.2024 - Current
  • Maintenance, utilities & Project

DGM – Maintenance (Regional maintenance Head)

Jubilant Food works Ltd.
01.2024 - 12.2024
  • Maintenance, utilities & Project

Maintenance Head

Varun Beverages Ltd.
03.2023 - 01.2024
  • Working as a HOD Maintenance.

Sr. Manager -Electrical

SLMG Beverages Pvt Ltd.
02.2019 - 03.2023
  • Working as a Sr Manager Electrical.

Sr. Manager in Utility & Project

Tata Motors Ltd.
03.2010 - 02.2019
  • Working as a senior manager in Plant Engineering.

Shift in Charge in Maintenance

Moser Baer India Ltd.
04.2008 - 03.2010
  • Shop maintenance where responsible for all maintenance related activities

Engineer - Maintenance

Paramount Cables.
06.2005 - 04.2008
  • Shop maintenance and utilities.

Education

B. Tech - Electrical

Institute of Engineering & Technology Rohilkhand University
Bareilly, U.P
01.2005

Intermediate - undefined

Govt. Inter College
Deoria
01.1999

High School - undefined

Govt. Inter College
Deoria
01.1997

Skills

MS-Excel, MS-Word, MS-Power point

Industrial Training

Summer vocational training 45-days at B.H.E.L Ranipur Haridwar

Present responsibilities

Working in SLMG Beverages authorized bottler of Coca Cola working as an Electrical Head for all plant electrical maintenance related activities. Look after and up keep all Utilities, Production lines and power distribution system. involved in green field project and expansion of beverages production lines. Where responsible for plant maintenance & Utilities equipment maintenance & project execution.

Major Highlights

  • Preparation of Electrical System Design complete with Power System Study and Calculation.
  • Successfully Installation and commissioning Tetra pack A3 high speed line 400PPM and 400PPM sig line.
  • Successfully Installation and commissioning KHS ASSB 766BPM line.
  • Successfully Installation and commissioning Krones 600 BPM line PET Hot fill line
  • Successfully Installation and commissioning Krones 750 BPM Ergo block line PET CSD fill line
  • In depended Installation and commissioning Process area all equipment.
  • Preparation of technical specification & Datasheet with BOQ of electrical equipment like electrical panels, cables, motors, cable trays, lighting fittings & other miscellaneous items.
  • Support the electrical design team in all aspects of the project such as load study, fault level, load flow analysis, switchgear, MCC, transformer and distribution board design, cable sizing, lighting calculation, Lux Level calculation, earthing and lighting design, cable routing and cable tray sizing etc.
  • Evaluation of offer & finalization of vendor based on technical & commercial parameters.
  • Follow up engineering schedules for smooth safe and timely completion of project.
  • Ensure spares management at plant level for use, preservation etc. during routine and shutdown activities.
  • Ensure inspection of Electrical Installation by State/ District Electrical inspectorate and closure of observation to meet compliance in stipulated time. While keeping Electrical equipment upkeep and various records as per IE rules to avoid any statutory strictures.
  • Identify training needs for departmental staff and arrange classroom or on job training, allot manpower for projects and review and optimize man-hours.
  • Ensure equipment availability by ensuring timely PM activities and corrective action
  • Update, review of electrical MIS reports to team. Prepared the monthly breakdown report with improvements plan including MTTR & MTBF. Continuous approach for improving OEE.
  • Implementation of Kaizens, Why-Why analysis, One point lesion and fish bone diagram (6M), DMAIC Approach for resolving any problem.
  • Working on TPM, 5’S, ISO 14001 and OHSAS 18001, ISO-TS 16949, creating Standard Operating Procedure for improving the uptime of machine.
  • Workings on Electro Pneumatic operated pick and place machinery (Solenoids valves, Cylinders, Rotary actuators, Manifold unit). Hydraulics system and devices
  • Working exposure of PLC make Siemens, MMI, SCADA make WINCC in touch and industrial networking and Process instruments
  • Working exposure on Air Compressors, HVAC, DG sets, Softener plant, STP, WTP, ETP

Personal Details

  • Father’s Name: Late Sh. I.C. Pandey
  • Date of Birth: 15th July 1983
  • Marital Status: Married

Section name

  • Current CTC: - 33 LPA (INR)
  • Notice Period: - Two month

Timeline

AGM – Electrical

SLMG Beverages Pvt Ltd.
12.2024 - Current

DGM – Maintenance (Regional maintenance Head)

Jubilant Food works Ltd.
01.2024 - 12.2024

Maintenance Head

Varun Beverages Ltd.
03.2023 - 01.2024

Sr. Manager -Electrical

SLMG Beverages Pvt Ltd.
02.2019 - 03.2023

Sr. Manager in Utility & Project

Tata Motors Ltd.
03.2010 - 02.2019

Shift in Charge in Maintenance

Moser Baer India Ltd.
04.2008 - 03.2010

Engineer - Maintenance

Paramount Cables.
06.2005 - 04.2008

Intermediate - undefined

Govt. Inter College

High School - undefined

Govt. Inter College

B. Tech - Electrical

Institute of Engineering & Technology Rohilkhand University
SHIV PANDEY