Project : ATAL
Client : Raytheon
Role : Lead Tool Designer of Jig & Fixture.
Achievements/Responsibilities:
- Lead team of Associate engineers throughout project.
- Floor Mounted Assembly Jig (CAT-II) & Drill Jig (CAT-III) Tool Designed & Jig setting for ATAL_Raytheon project.
- Coordinating with supplier for Manufacturing of tools.
Project : PC-12
Client : PILATUS
Role : Lead Tool Designer of Jig & Fixture.
Achievements/Responsibilities:
- Pilatus Aviation is manufacturer of luxury business class aircraft.
- Associated with installation and calibration of Major Assembly tools of PC-12..
- Designed scaffolds and Movement Dolly's of PC-12.
- Designed Drilling Jig and marking templates for PC-12.
Project : AH-6i Vertical stabilizer, B-777 Up-Lock Box, CH-47 Crown and Tail cone & AH-64 Vertical stabilizer
Client : BOEING.
Role : Tool Designer of Jig & Fixture.
Achievements/Responsibilities:
- Floor Mounted Assembly Jig (CAT-II) & Drill Jig(CAT-III) Tool Designed & Jig setting for Boeing-777 Up lock box project.
- Floor Mounted Assembly Jig (CAT-II) & Drill Jig(CAT-III) Tool Designed & Jig setting for AH-6i Vertical stabilizer project.
- Complicated Jig & Fixture setting done in CH-47 Chinook Crown & Tail cone project.
- Designed CAT-III Drill Jig and packing crates for CH-47 Crown and Tail Cone.
- Supported in designing activity and tool co-ordinate for AH-64 vertical stabilizer.
- Designed Packing crates for Boeing777 Uplock Box, AH-6i Vertical stabilizer, CH-47 Tail cone & Crown and AH-64 SAS&VSB.
- Reworked major Boeing Tools like WL-72 with co-ordination of Master Gauge, Drill jig, Master Gauge Rework & EAPS Tool for CH-47 Program.
- Provided production improvement tool : Bell Crank Tool, Locating Jig(Japan Configuration) and EOP Tool for CH-47 Crown.