Summary
Overview
Work History
Education
Training
Marital Status
Date of Birth
Website Link
Timeline
Generic
SNEHASHIS MAITY

SNEHASHIS MAITY

Raipur

Summary

Experienced Power Plant Professional adept in bringing forth expertise in concept to commissioning and operation & maintenance of power plant. Experienced with the latest cutting edge technology and procedures. Able to effectively self-manage during independent projects, as well as collaborate as part of a productive team. Engineering, ordering and project implementation (planning, coordination and project management) of 1x15MW CPP and 2x15MW CGPP(Aluminium Refinery). 2x18MW Rice straw based power plant. Working experience in the Stoker fired Boiler, PF Boiler, AFBC Boiler, WHRB , CFBC Boiler, Vibrating grate Boiler. O&M of the thermal power plants of 10MW, 15MW, 25MW, 30MW,210MW, 350MW. Capacity of coal/Biomass/Pet coke/dolachar based Worked in IPP, CPP, CGPP( Aluminium and oil refinery) Worked as Head of the Power Plant Developed India’s first Rice Straw based power plant Total Experience: 28Yrs +

Overview

29
29
years of professional experience

Work History

DGM (Power Plant)

M/S Shri Bajrang Power and Ispat Ltd
03.2024 - Current
  • Managing O&M of the Captive Power Plant having 3x63TPH WHRB Boilers, DMP, 1x30MW Turbine and 1x16MW Condensing Turbine.
  • Doing system improvement
  • Doing recruitment and training to operating staff
  • Project conceptualization and vender finalization activities of 57MW unit with ACC, CFBC Boiler, WHRB and its auxiliaries.

Plant Head at Nirma, Porbandar

BNK Power Solution
04.2023 - 03.2024
  • Manage O&M of the Cogeneration Power Plant having 2x120TPH CFBC Boilers, CHP, DMP, 2x14.5MW Back Pressure Turbine and 1x14.5 Condensing Turbine.
  • System improvement
  • Mobilization and recruitment of the operating staff

Head (Tech)

SAEL
02.2018 - 01.2020
  • Conceptualization of the project
  • Taking NOCs for project
  • Ordering /tendering of the different packages
  • Project Implementation
  • Project Management

Power Plant Expert

ThyssenKrupp
01.2020 - 01.2018
  • Trouble Shooting
  • System improvement- BPCL-Bina Refinery
  • Site mobilisation and manpower recruitment- ABG-Lapanga and PJL
  • Worked as Residential Manager at M/S Prism Johnson Cement, MP

Ind-Bharat Power Plant
01.2017 - 01.2018
  • Operation of 2x350mw IPP

GM-Power Plant

M/S SKS Ispat And Power
08.2014 - 01.2017
  • Responsible for Operation management of the 85MW(2x30MW and 1x25MW, 4nos of WHRB and 1no of AFBC and CFBC Boilers).

Head- O&M (Power Plant)

Hira Group
01.2009 - 01.2014
  • O&M of the power plant having total capacity of 65MW.
  • Execution of 30MW, Biomass project.
  • Implementation of IMS, supply chain management system, TPM
  • Plant performance and system improvement.
  • Training of the subordinates
  • Power trading and CDM
  • Worked as Head Power Plant in Jagdamba Power and Alloys Ltd, having 25MW unit, AFBC Boiler, HTC Turbine, Air cooled condenser and other auxiliaries.

Manager – Power Plant

HINDALCO Industries Ltd.
01.2005 - 01.2009
  • Ordering of the different packages of 2x15MW CGPP having 3x140TPH CFBC Boilers, 2x15 MW TG sets, 3x75 cu.m/hr DM Plant, 140TPH CHP, HVAC system, Fire Fighting system, Ash Handling system, Cooling Tower with other auxiliaries in time and take measures for cost control of the packages.
  • Planning and coordinating with consultant and the vendors for the engineering, ordering, manufacturing and supply of the different equipment.
  • Successful commissioning of the equipment, 3x140TPH CFBC Boiler with stripper coolers (first time installed in India), 3x75cum/hr DM Plant, 2x15MW STG sets, Ash handling plant and other auxiliaries with the system controlled through DCS/PLC system.
  • Ensuring continuous quality steam supply to Alumina refinery through steam lines of 48ata to HTD , 6ata to Evaporator, 6ata (ring header) to Calcinations and miscellaneous usage, 11ata to LTD and 21ata to Kiln. This steam supplies through Turbine extractions as well as through the outlet steam common header.
  • Ensuring the maximum utilisation of the return condensate from refinery so that DM water consumption can be reduced.
  • Ensuring the quality and quantity of production of DM water, steam and power.
  • Ensuring and monitor the healthiness of the all equipment like Turbines and its auxiliaries, Generators and its auxiliaries, Boilers, PA Fans, SA Fans, ID Fans, CW Pumps, Boiler Feed Pumps, Scanner Cooling Fans, Wall seal blowers, ACW Pumps, Cooling Tower, CT Fans, HP & LP dozing pumps, DG sets, DM transfer pumps, HSD transferring pumps, Burner system, HVAC system, Fire fighting system and other related equipment.

Manager (Operation)

Usha Martin Limited
01.1999 - 01.2005
  • Finalization of Vendors for thermal project of 15MW CPP , having heat recovery boiler, TG set ( Refurbishment done) and other auxiliaries.
  • Completion of the ordering of the different equipment in a scheduled time.
  • Completion of the Commissioning of the 25MW CPP having AFBC Boiler, TG set and other auxiliaries in a schedule time.
  • Managed the operation of the 25MW CPP year and monitored the daily performance of the plant.

Control Engineer

Tenughat Vidyut Nigam Ltd.
01.1996 - 01.1999
  • Stabilized the unit of 2x210 MW thermal power plant from oil synchronization to commercial generation.
  • Responsible for control room shift operation of 2x210MW thermal power plant.

Technical Officer

Dishergarh Power Supply Co. Ltd.
01.1993 - 01.1996
  • Managed the shift activities of 2x10 MW Chinakuri Captive Power Plant having spreader stoker Boiler, TG and other auxiliaries system.

Education

B.E - Power Plant Engineering

Jadavpur University
Kolkata, West Bengal
01.1993

Training

  • Participated in PPF induction training at NTPC- KORBA and Farakka with simulation of 500MW thermal power plant.
  • Participated in the Lead Auditor Programe-ISO14001

Marital Status

Married.

Date of Birth

14th July 1972.

Website Link

https://www.blogger.com/blog/posts/8997025415824127954?tab=mj

Timeline

DGM (Power Plant)

M/S Shri Bajrang Power and Ispat Ltd
03.2024 - Current

Plant Head at Nirma, Porbandar

BNK Power Solution
04.2023 - 03.2024

Power Plant Expert

ThyssenKrupp
01.2020 - 01.2018

Head (Tech)

SAEL
02.2018 - 01.2020

Ind-Bharat Power Plant
01.2017 - 01.2018

GM-Power Plant

M/S SKS Ispat And Power
08.2014 - 01.2017

Head- O&M (Power Plant)

Hira Group
01.2009 - 01.2014

Manager – Power Plant

HINDALCO Industries Ltd.
01.2005 - 01.2009

Manager (Operation)

Usha Martin Limited
01.1999 - 01.2005

Control Engineer

Tenughat Vidyut Nigam Ltd.
01.1996 - 01.1999

Technical Officer

Dishergarh Power Supply Co. Ltd.
01.1993 - 01.1996

B.E - Power Plant Engineering

Jadavpur University
SNEHASHIS MAITY