Work Preference
Summary
Overview
Work History
Education
Skills
Interests
Work Availability
Cricket,Music,Drawing,Football
Accomplishments
Languages
Software
Timeline
Generic
SUMAN ROY

SUMAN ROY

CONSTRUCTION & INFRASTRUCTURE PROJECT
Bandel,WB

Work Preference

Work Type

Full Time

Location Preference

On-SiteRemote

Important To Me

Company CultureTeam Building / Company RetreatsCareer advancement

Summary

SENIOR MANAGER leading tunnel and heavy civil site execution from design review through handover. Coordinates site methodology, safety talks, material testing, and drawing checks to keep work aligned with approved plans and quality requirements. Oversees daily progress, preparing 26+ daily progress reports per month, equipment deployment, and guidance for 51+ workers to maintain construction flow on complex projects.

Overview

2
2
Languages
18
18
years of professional experience

Work History

SENIOR MANAGER

Geoportal Engineering Consultancy Pvt.Ltd.
06.2023 - Current
  • Brief Descriptions of Responsibilities is in:-
  • Executed Site as per Design and Drawing
  • Conducting safety talk & explaining to each and every team member
  • Testing / checking of construction materials such as aggregate, sand, Concrete etc.
  • Check all Project drawings & Materials, monitoring from Ensure that proper methodology and instructions are followed in execution of various Tunnel activities.
  • June 2023 - Present

PROJECT MANAGER

Shivanya Construction Pvt. Ltd.
02.2021 - 05.2023
  • Brief Descriptions of Responsibilities in:-
  • Daily scheduling of the work, regarding the manpower time & Cost while executing the project to achieve the company goal.
  • Conducting safety talk & explaining to each and every team member
  • Planning for material & consumable to avoid any delay in daily progress.
  • Testing / checking of construction materials such as aggregate, sand, Concrete etc.
  • Deployment of machinery according to daily requirements, investigate base metal imperfections & deviations, check joint fit-up & weld visual, verify the application of the approved welding procedure, verify the qualifications of the Technical team & Fabrication department. Stage and Final Inspection of equipment / accessories like Column, and structure of Iron Rib etc. I am look over Well conversant with various Destructive & Non-Destructive Testing methods like visual, D.P, RT, UT, MPT, wrapping coating (Holiday testing) and Hydro testing. Ensure that proper methodology and instructions are followed in execution of various activities.
  • Feb 2021 - May 2023

SR.MANAGER

Ege Consultancy & Pvt. Ltd.
01.2019 - 01.2021
  • Brief Descriptions of Responsibilities in:-
  • Check all Project drawings & Materials, monitoring from Ensure that proper methodology and instructions are followed in execution of various Tunnel activities.
  • Planning for material & consumable to avoid any delay in daily progress.
  • Testing / checking of construction materials such as aggregate, sand, Concrete etc.
  • Deployment of machinery according to daily work plan
  • Preparation of daily progress report and attending the weekly and monthly progress meeting with client.
  • Jan 2019 - Jan 2021

DEPUTY PROJECT MANAGER

DRTMS Pvt.Ltd.
04.2017 - 01.2019
  • Brief Descriptions of Responsibilities in:-
  • Involve in pre planning activities like drawing study, BOQ study, preparation of QAP (Quality Assurance Plan), Preparation of DPR (daily progress report), Shot-Concrete test, NDT required at site and all the quality relevant documents which is required at site before & after the start work.
  • Inspection and testing of water electric connection line about 25km at site.
  • Coordinating with senior officials for various site activities.
  • Check the junior’s performance and to take part
  • Maintain the all records of Quality relevant work. Like logbook, DIR (Daily inspection Report), Weekly Inspection Report, MIS (Management inspection sheet) Drawings Record with DCN (Drawing change note), and all fabrication and Erection relevant documents.
  • Responsible for the final inspection of project and handing over
  • Apr 2017 - Jan 2019

CIVIL MANAGER

ABCI Infrastructure Pvt. Ltd.
08.2015 - 03.2017
  • Brief Descriptions of Responsibilities in:-
  • Coordinating with senior & Junior officials for various site activities.
  • Check the junior’s performance and to take part in the junior qualification.
  • Maintain all records of Quality relevant work. Like logbook, DIR (Daily inspection Report), Weekly Inspection Report, MIS (Management inspection sheet) Drawings Record with DCN (Drawing change note), and all fabrication and Erection relevant documents.
  • Responsible for the Department inspection of project and handing over
  • Aug 2015 - March 2017

SITE ENGINEER

Patel Engineering Ltd.
04.2012 - 08.2015
  • Brief Descriptions of Responsibilities in:-
  • Executed Site as per Design and Drawing.
  • Supervised the activities of all project work, like fabrication work, Steel binding, stc
  • Monitoring survey team.
  • Check the junior’s performance and to take part in the junior qualification.
  • Supervised The activity like profile marking for tunnel, Drilling Pattern by Boomer and Jack Hammer.
  • Supervised the activity of tunnel support system like rock bolt fixing, Anchor Bolts fixing, Pipe Roofing etc.
  • Preapare Daily Progress Report.
  • Apr 2011 - Aug 2015

ASSISTANCE ENGINEER

GREENKO GROUP
03.2011 - 02.2012
  • Worked with Greenko Group of Company. as a Asst. Engg. of technical department. Company was engaged in manufacturing fabrication & erection of Heat Mass transfer Equipment, column trays, from 96mw Sneha Kinetic Hydro Power Project Ltd.
  • Responsible for Prepare, schedule, coordinate and monitor the assigned engineering projects of HRT (Head Race tunnel) total length 4.70 Km, finished diameter 3.00meter, modified horseshoe shape, by NATM methodology construction. Interact daily with the clients to interpret their needs and requirements and represent them in the field. Assign responsibilities and mentor project team. Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support. Manage and direct the construction, operations, or maintenance activities at project site.
  • Ensure the Quality of inward & outward material as per the relevant standards.
  • Checking of Methodology statement with respect to specification or as per the relevant standards.
  • Mar 2009 - Mar 2011

TRAINEE SURVEY ENGINEER

Sew Infrastructure Ltd.
04.2008 - 03.2009
  • Brief Descriptions of Responsibilities in:-
  • Tunnel Profile Marking as per Drawing
  • Development of process flow chart.
  • Knowledge about column, bolt, and structure.
  • Apr 2008 - Mar 2009

Education

Madhyamik -

Bandel ST.JOHNS.High School
01-2003

B.TECH (Civil Engineering) - Civil Engineering

West Bengal Institute Of Technology
01-2011

Survey Engg - undefined

W.B.C.S
01-2009

Computer Hardware & Networking Course - undefined

Brenolia
01-2006

Higher Secondary Education - undefined

Chinsurah Duff High School
01-2005

Skills

Project scheduling

Site supervision

Progress reporting

Client coordination

Material planning

Quality assurance

Safety management

Drawing review

Inspection reporting

Leadership skills

Contract administration

BOQ preparation

Earned value management

Risk assessment

Resource allocation

Interests

Reading Book, Playing Cricket, Listening Music, Driving All type of Construction Machinery & vehicle

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Cricket,Music,Drawing,Football

  • Cricket & Football: Active sports enthusiast with a strong focus on teamwork, strategy, discipline, and leadership skills.
  • Drawing & Arts: Passionate about visual art and sketching, demonstrating strong attention to detail, patience, and creativity.
  • Music: Enjoy listening to and exploring diverse music genres, which aids in stress management, focus, and creative thinking.

Accomplishments

  • Successfully recognized for achieving accuracy and efficiency in daily core operations and task execution.
  • Optimized process workflows, resulting in improved time management and reduced operational cost.
  • Resolved key product/service issues through active feedback analysis and process testing.

Languages

English
Intermediate (B1)
Bengali
Bilingual or Proficient (C2)

Software

Autocad

Timeline

SENIOR MANAGER

Geoportal Engineering Consultancy Pvt.Ltd.
06.2023 - Current

PROJECT MANAGER

Shivanya Construction Pvt. Ltd.
02.2021 - 05.2023

SR.MANAGER

Ege Consultancy & Pvt. Ltd.
01.2019 - 01.2021

DEPUTY PROJECT MANAGER

DRTMS Pvt.Ltd.
04.2017 - 01.2019

CIVIL MANAGER

ABCI Infrastructure Pvt. Ltd.
08.2015 - 03.2017

SITE ENGINEER

Patel Engineering Ltd.
04.2012 - 08.2015

ASSISTANCE ENGINEER

GREENKO GROUP
03.2011 - 02.2012

TRAINEE SURVEY ENGINEER

Sew Infrastructure Ltd.
04.2008 - 03.2009

Higher Secondary Education - undefined

Chinsurah Duff High School

Computer Hardware & Networking Course - undefined

Brenolia

Survey Engg - undefined

W.B.C.S

B.TECH (Civil Engineering) - Civil Engineering

West Bengal Institute Of Technology

Madhyamik -

Bandel ST.JOHNS.High School
SUMAN ROYCONSTRUCTION & INFRASTRUCTURE PROJECT