Summary
Overview
Work History
Education
Skills
Languages
Personal information
Timeline
Generic
Veeraraghavan  R

Veeraraghavan R

Kanchipuram

Summary

Proactive manager with demonstrated leadership abilities, strategic planning expertise and problem-solving acumen. Assists D.General managers with accomplishing demanding targets by encouraging staff and coordinating resources. Methodical and well-organized in optimizing coverage to meet operational demands.

Overview

15
15
years of professional experience

Work History

CHIEF MANAGER

Samsung India Electronics Private Ltd
Kanchipuram
02.2017 - Current
  • Chief Manager with 9+ years experience in Washing machine development & Production Support.
  • Led overall new model development, release, Product testing, and production implementation for washing machines (front load, top load, semi-auto).
  • Managed product development processes and timelines effectively.
  • Implemented process improvements that enhanced operational efficiency and reduced costs.
  • Around 1M$ in annual cost savings ideas generated every year through tear down evaluation of various subsidiary and competitor models.
  • Market quality defects 2.74% reduced by implementing quality improvement on product.
  • Facilitated communication between departments to enhance collaboration.
  • Collaborated with cross-functional teams across procurement, engineering, and production to streamline operations. functional teams like Procurement, Process Engineering, Production, Planning and quality Control.
  • Led cross-functional teams to implement strategic initiatives.
  • Ensuring Project adherence to Time, Cost, Quality & Performance targets at various stages of Project.
  • Executed and managed the approval process from ECR initiation to ECN implementation in a timely manner.
  • Worked with vendors and cross-functional teams for new model/vendor & mold development.
  • Monitored and evaluated full life cycle requirements for product development according to reliability test standards.
  • Validated improvement designs for 100% reliability via validation plans, design reviews, and testing.
  • Identify opportunities or implement changes to improve products or reduce costs using knowledge of product design, materials and parts or injection/press processes, assembly methods.
  • Determined root causes of failures in process quality & market quality defects and recommend changes in designs, tolerances, or packing methods.
  • Ensured factory productivity by addressing product design-related quality and assembly line issues.
  • Demonstrated capability in managing projects from initial concept to final product. a project from initial concept to product.
  • Strong analytical, troubleshooting and problem solving skills.
  • Competent in Design for manufacturing and assembly and Failure mode effective analysis.

DESIGN ENGINEER-PRESS TOOLS

Metal forms Pvt Ltd
Chennai
12.2013 - 01.2017
  • Researched and developed ideas for new tools, jigs, and fixtures based on customer drawings.
  • Researching and developing ideas for new tools, jigs & fixtures as per customer drawing.
  • Provided first-line support for customer technical inquiries.
  • Preparation of tool cost estimation as per customer drawing.
  • Advising the purchasing department on tooling & product purchase & cost control.
  • Advised purchasing department on tooling and product procurement processes, ensuring cost-effective decisions.
  • Prepared tool cost estimations based on customer drawings, facilitating informed project budgeting.
  • Major Projects done: Project 1: Thunder bolt protective grill & 20 parts. Customer: Daimler India Commercial Vehicles Pvt ltd. Work Done: Designed around 10 tools & 2 welding fixtures.
  • Project 2 : Side Under Protection Device. Customer : Ashok Leyland. Work Done : Designed around 2 welding fixtures.

GAT

TVS Sundaram Clayton Ltd
Chennai
12.2011 - 12.2012
  • Having worked exposure in SAP (Production).
  • Co-ordination with Die service and Maintenance department for achieving 100% casting dispatch.
  • Planned die spare parts and manpower allocation to meet production targets.
  • Coordinated with die service and maintenance department to achieve 100% casting dispatch.
  • Prepared monthly production and rejection reports, comparing current results with previous data.
  • Guided employees in implementing Kaizen practices to enhance efficiency.
  • Conducted time studies focused on quality across different dies to improve processes.
  • Facilitate Employees for implementing Kaizen and to be guided for suggestions.
  • Carryout TPM activities in machines and Ensuring good 5S at shop floor.

Education

BE - Mechanical Engineering

Mepco Schlenk Engineering College
Sivakasi

DME - Mechanical Engineering

P A C Ramasamy Raja Polytechnic College
Rajapalayam

Skills

  • Project Management
  • Product Design & Development
  • Quality assurance
  • DFMEA
  • Process improvement
  • Siemens NX
  • Solidworks
  • PLM
  • NERP/SAP
  • Vendor management
  • Cross-functional collaboration
  • Vendor management

Languages

  • English, Proficient
  • Telugu, Proficient
  • Tamil, Proficient

Personal information

Father's Name : Mr. P.Raju

Date of Birth : 30th May 1990

Marital Status :Married

Passport no : L4150187

Timeline

CHIEF MANAGER

Samsung India Electronics Private Ltd
02.2017 - Current

DESIGN ENGINEER-PRESS TOOLS

Metal forms Pvt Ltd
12.2013 - 01.2017

GAT

TVS Sundaram Clayton Ltd
12.2011 - 12.2012

BE - Mechanical Engineering

Mepco Schlenk Engineering College

DME - Mechanical Engineering

P A C Ramasamy Raja Polytechnic College
Veeraraghavan R