Summary
Overview
Work History
Education
Skills
Personal Information
Disclaimer
Timeline
Hi, I’m

NAVEEN CHANDRASHEKARA GOWDA

Deputy General Manager
Kolkata,west Bengal
NAVEEN CHANDRASHEKARA GOWDA

Summary

An accomplished Project Manager with nearly 17+Years of experience in Project Management, Maintenance, Testing and commissioning Quality Assurance & Control, Resource Optimization and HSE Management. Extensive Pre and Post contract work experience of more than 17+ years in handling a diverse range of projects like High rise buildings, Commercial, Industrial,Residential, Office Fit-Out, Interior finishes, Hotel Retails. Able to manage a very large team as well as domestic and nominated subcontractors. Supervises the complete construction work of assigned project and ensures its completion within budgeted time, cost and productivity and quality standards.

Overview

17
years of professional experience
4

English

1

Kannada

1

Hindi

1

Telugu

1

Tamil

7
years of post-secondary education

Work History

Colliers International India Pvt Ltd

Deputy General Manager
2023.07 - Current (1 year & 2 months)

Job overview

  • Handling Candor Plot C, retail and commercial mixed development project
  • Overall built-up area of the project is 686,759 sqft with a total leasable area 560,816 sqft
  • Project is Desgned to platinum rated LEED certification.
  • Overall cost of the project is estimated to be 250 Crores INR
  • This is mixed development project with both retail and commercial IT campus development

Gleeds Consulting India Pvt Ltd

Construction Manager
2018.11 - 2023.07 (4 years & 8 months)

Job overview

  • Handling Kempe Gowda International Airport, Bengaluru – Terminal 2 retail area finishes
  • Overall built-up area of the project is 255,661 sqm with a capacity of handling 25 million passengers every year
  • KIA is the largest airport building in the world to have been pre certified as a LEED platinum building
  • Overall cost of the project is estimated to be 5000 Crores INR
  • Ceiling finishes comprises of engineered bamboo and aluminum baffles
  • Flooring material used are of terrazzo and Natural stone
  • Sustainability features, lighting, natural greenery, and plants are key features of the airport.

TRC Engineering India Pvt Ltd

Project Manager
2016.07 - 2018.10 (2 years & 3 months)

Job overview

  • Handled SDB block, Infosys IT campus commercial space at electronic city Bangalore
  • Project is having an overall estimated budget 0f 5000 million INR with a built-up area 1.6 million sq ft
  • The structure comprises of 3B+GF+9 Upper floors accommodate around 8000 employees
  • It has food court at 5th floor and UGR, STP at basement lvl.

Renaissance Consultants LLP

Construction Manager
2014.01 - 2016.06 (2 years & 5 months)

Job overview

  • Handled Premium apartment project spread across 1, 29,500 Sqft with an estimated budget of 1250 million INR
  • The Confident Leo comprises of premium range of apartments in Bangalore with best-in-class amenities
  • The structure stands tall with 13 floors and houses uniquely designed 3BHK luxury apartments with soft scape swimming pool, STP, Underground Sump, Jagging track with children’s playground.

Sky Oryx JV (Taisei & TAV)

Civil Inspector
2012.02 - 2012.07 (5 months)

Job overview

  • As a Civil Inspector worked at a prestigious world class Hamad International Airport, Doha with Main contractor
  • The new airport has a capacity to accommodate 24 million passengers and 750000 metric tonnes of cargo annually
  • It has a feature of two longest commercial runways in the world, an 85-meter-high control tower, 510000sqmt passenger terminal with 40 gates with an estimated budget 12.5 billion USD.

FABS Pvt Ltd

Project Engineer
2011.01 - 2012.01 (1 year)

Job overview

Execution of Main Plant Building,12TPH boiler Block, DG yard ,High speed diesel yard, Coal yard, Crusher yard, Engineering block ,Water Treatment Plant, Waste Water Treatment Plant, at Nanjangud

Job Responsibilities:

  • Inspection of materials at the vendors place before the dispatch of materials to site.
  • Material inspection after receipt at site.
  • Following and updating the site checklist
  • Checking of WMS and JSA for the job activity and getting it cleared from the safety manager.
  • Conducting meeting with the vendor and updating the same to the client.
  • Preparation of MOM and circulating the same to the vendors and the client.
  • Progress billing, verification & reconciliation of interim payment certificates, variation review from the original BOQ,
  • Change order management and claim for extra work done.
  • Planning and scheduling the site activities with the vendor on daily, weekly and monthly basis
  • Quality inspection of the work at site.
  • Co-ordination with the vendor representative for the proper planning of the daily activities.
  • Re-scheduling of the activities depending on the priority of the client.

AL SUBHI AL SHAMILAH EST

Project Engineer
2010.03 - 2010.10 (7 months)

Job overview

  • Construction of Tilal Complex, Al khuwair, boushar
  • Execution of work as per drawings, specifications
  • Managing subcontractors and expediting the progress in compliance to the project specific requirements
  • Co-ordination amongst the building focal point, fire alarm subcontractors, HSE operations and client for the smooth flow of progress at site.

SYConE CPMC Pvt Ltd

Project Engineer
2008.01 - 2009.12 (1 year & 11 months)

Job overview

  • Project Handled: Sankalp Central Park, Mysore - Construction of 10 Towers of 8 storied apartment towers and swimming pool, landscaped podium slab connecting all the ten towers, Club House interior works
  • (Contract Sum INR – 1250 million) IBIS Hotel, Jaipur
  • Area: 2lakh Sqft, Project Cost: INR-350 million
  • Total No of Rooms: 118 Nos -Worked as quality in charge and supervised total hotel interior finishes from start to finish) FLAME University Campus, Pune
  • Area: 70 acres, Project Cost: INR – 1200 million-Worked as a quality control engineer and handed over hostel block, classroom, auditorium, and external facade finishes final finishes.

Ukn Properties Pvt Ltd

Project Engineer
2006.09 - 2007.12 (1 year & 3 months)

Job overview

  • Project Summary: The Banyan – Apartment with 132 Room 4-star businesses Hotel, Bangalore
  • Area 56000 sqft
  • Project cost: INR 400 million - Worked as a project engineer and supervised total hotel interior finishes from start to finish) Lotus Lounge-Restaurant, Bangalore; Area: 12000 sqft
  • Project cost: INR 40 million - Worked as a project engineer and supervised total restaurant interior finishes from start to finish)

Education

AIT College Affiliated VTU Belgaum , Chikkamaglur

Bachelor of Science from Civil Engineering
1999.07 - 2006.02 (6 years & 7 months)

Skills

Project Managementundefined

Personal Information

  • Passport Number: Z6984279
  • Passport Expiry Date: 09/14/32
  • Date of Birth: 11/10/81
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married
  • Contact : +91-9886138393

Disclaimer

I, the undersigned certify that to the best of my knowledge and belief, these data correctly describe me, my Qualification, and my experience.

Timeline

Deputy General Manager

Colliers International India Pvt Ltd
2023.07 - Current (1 year & 2 months)

Construction Manager

Gleeds Consulting India Pvt Ltd
2018.11 - 2023.07 (4 years & 8 months)

Project Manager

TRC Engineering India Pvt Ltd
2016.07 - 2018.10 (2 years & 3 months)

Construction Manager

Renaissance Consultants LLP
2014.01 - 2016.06 (2 years & 5 months)

Civil Inspector

Sky Oryx JV (Taisei & TAV)
2012.02 - 2012.07 (5 months)

Project Engineer

FABS Pvt Ltd
2011.01 - 2012.01 (1 year)

Project Engineer

AL SUBHI AL SHAMILAH EST
2010.03 - 2010.10 (7 months)

Project Engineer

SYConE CPMC Pvt Ltd
2008.01 - 2009.12 (1 year & 11 months)

Project Engineer

Ukn Properties Pvt Ltd
2006.09 - 2007.12 (1 year & 3 months)

AIT College Affiliated VTU Belgaum

Bachelor of Science from Civil Engineering
1999.07 - 2006.02 (6 years & 7 months)
NAVEEN CHANDRASHEKARA GOWDADeputy General Manager