Summary
Overview
Work History
Education
Skills
Languages
Projects
Certification
Timeline
Generic

KANHU CHAMPATI

ROURKELA

Summary

Dynamic Assistant Manager at JSW Steel Ltd. with proven expertise in project management and mechanical maintenance. Spearheaded preventive maintenance initiatives, enhancing equipment reliability and minimizing downtime. Proficient in SAP PM module and SOP development, driving efficiency and inventory optimization in the blast furnace department. Recognized for leadership in TPM implementation.

Overview

2
2
years of professional experience
1
1
Certification

Work History

Assistant Manager

JSW Steel Ltd.
Jharsuguda
07.2023 - Current
  • Inspection and maintenance of blast furnace equipment (i.e., GCP axial Cyclone, Cast house , INBA , Stove & PCI equipment)
  • Planning and execution of preventive and predictive maintenance, with the help of condition monitoring.
  • Coordinating with the design and workshop departments for job work orders and spare parts planning.
  • Efficient experience of using the SAP PM module for inter-department planned maintenance. Creating a BOM (Bill of Materials) in SAP for the Blast Furnace department.
  • Responsibility of SOP (Standard Operating Procedure) and SMP (Standard Maintenance Procedure) document preparation, implementation, and total execution in the Blast Furnace department.
  • Inventory management of spare parts and equipment in the blast furnace department, which includes prior planning to order spares in advance for minimizing MTTR.
  • An essential part of TPM and 5S in the blast furnace department. Head of the TPM 3rd pillar (PM) in my department. Part of the TPM JH execution board.
  • Commissioning of the TRT (Top-gas Recovery Turbine) of 7 MW capacity in my department.

Education

B.Tech. - Mechanical Engineering

National Institute of Technology
Silchar
05-2023

Higher Secondary (12th) - Science

Govt. Junior College
Rourkela
06-2021

Skills

  • Project management
  • SOP development
  • Employee scheduling
  • SAP PM module
  • Inventory management
  • Mechanical maintenance

Languages

ODIA
First Language
Hindi
Proficient (C2)
C2
English
Proficient (C2)
C2

Projects

  • Hydrophobic Packaging Materials Preparation from Banana stem fiber:

- Enhanced raw banana stem into natural Fibers using hydrolysis, Conducted UTM & Tensile Test of the fiber.

- As it was a hydrophilic fiber the main challenge was to turn it into hydrophobic material .

- After turning it into hydrophobic fiber we conducted UTM & Tensile tests to check it's strength & Conducted tests for  measuring it's capacity for being a hydrophobic.

  • Commssioning of TRT ( Top-gas Recovery Turbine) 7 MW capacity:

- to use the dynamic flow of the efficient blast furnace gas (BF gas) installation of this turbine was done by JSW steel .

-Conduction of installation & post installation the equipment testing of Turbine, Generator, hydraulic oil pumps, barring gear etc.

           

Certification

  • ICRAME (International Conference on Recent Advances in Mechanical Engineering)

Timeline

Assistant Manager

JSW Steel Ltd.
07.2023 - Current

B.Tech. - Mechanical Engineering

National Institute of Technology

Higher Secondary (12th) - Science

Govt. Junior College
KANHU CHAMPATI