Summary
Overview
Work History
Education
Skills
Accomplishments
Additional Information
Passport Validity
Personal Information
Timeline
Generic
NARENDRA KUMAR SAINI

NARENDRA KUMAR SAINI

Chittaurgarh

Summary

Experienced and goal-driven professional with extensive expertise in the installation, testing, and operation of advanced and robust electrical equipment. Skilled in managing projects from start to finish, including planning, procurement, execution, monitoring, and closeout. Committed to ensuring high-quality work and safety throughout the planning, engineering, and execution phases. Proficient in preparing project documentation and conducting audit reconciliation to guarantee timely and cost-effective project completion.

Overview

19
19
years of professional experience

Work History

Deputy Manager – Electrical Projects and Maintenance

Birla Corporation Limited, Unit Chanderia Cement Works
09.2018 - Current
  • Expansion of Pyro Circuit and increasing capacity of Kiln from 3600TPD to 6000TPD Project
  • Modification of Cooler ESP (Expanding 4 Field from 3 Field) along with replacement of Cooler ESP vent fan
  • Modification of Roller Press converting to Dual Drive from Single Drive
  • Direct feeding of Crushed Limestone from Crusher to OLBC
  • Planning, Procurement, Erection and Commissioning of NCCW Co-Processing AFR 25 TPH Project-Supplied by M/S ATS Group
  • Planning, Procurement, Erection and Commissioning of CCW Co-Processing AFR 10 TPH Project-Supplied by M/S ATS Group
  • Planning, Procurement, Erection and Commissioning of Pre-Processing AFR Project 25 TPH-Supplied by M/S Alfa Therm
  • Up-Gradation of Linear Stacker (1250 TPH) & Feeding Belt Conveyor.


Electrical Engineer-1 (Projects and Maintenance)

JAYPEE CHURK INUSTRIAL COMPLEX (A Unit of Jaiprakash Associates Ltd.)
01.2013 - 09.2018
  • Accountable for end-to-end project management & coordination, erection and commissioning of Electrical and Mechanical Systems, including taking corrective measures / steps to rectify the equipment’s faults
  • Review and Verify BOM before erection
  • Review of erection GA Schematics, interlocks and Preparation of cable schedule
  • Review of SLD as per specification
  • Erection, Commissioning of 225 TPH grinding unit and 60 MW CPP
  • Erection, Commissioning and Testing of Up to 12.5 MVA Distribution Transformers
  • Installation, Testing and commissioning of HT/LT panels and HT/LT motors
  • Familiar with VFD (Siemens & ABB) drives & UPS.

Team Member (Electrical Project)

M/S SAINT GOBAIN GLASS INDIA LIMITED
05.2011 - 12.2012
  • Erection and Commissioning of HT switchboard 6.6 kV, PCC and MCC Panels; reviewed manufacturing drawings before releasing for production, review of B.O.Q, Verification of specifications, SLD, wiring diagrams etc
  • Checked component details & originated purchase requisition; made site visits for refurbishment / expansion or up gradation of existing panels
  • Prepared inspection reports, attended site complaints, co-ordinate all site works
  • Successfully managed installation, testing and commissioning of various equipments under ongoing projects, also, anticipated & resolved problems and managed trouble shooting & repair work.

Electrical Engineer (Maintenance)

BIRLA CEMENT WORKS
06.2005 - 05.2011
  • Maintenance & Operation of variety of HT motor and LT motors
  • Operation and maintenance of 132/6.6 KV switchyard
  • Operation and maintenance of Power transformer of 12.5/16.5 MVA and distribution transformer up to 2.5 MVA
  • Maintenance of Wagon Tippler, Coal & Limestone Stackers and Reclaimers
  • Managed Parallel operation of different captive sources and with the grid for optimum utilization of resources
  • Accountable for planning and modification of available resources and manpower and safe work practice and acknowledgement of work permit system & material management Implemented Safety Measurement at all levels of Operation in all Equipments in plant & Utility section
  • Involved in implementation of preventive, planned and predictive maintenance to maximize operational availability of machines Worked on ISO 9001: 2000 and 14001 documentation and was accountable for monitoring the total operational and maintenance aspects of all electrical equipments
  • Managed work allocation for Man Power and carried out coordination of construction, Erection, Commissioning of all type of instrument.

Education

Science Education

Govt. Senior Secondary School,
Indragarh

Matriculation -

Govt. Sr. Sec. School
Indragarh

Engineering Diploma in Electrical Engineering -

Vidhya Bhawan Polytechnic College
01.2004

Skills

  • Project Management Skill
  • HIRA Preparation
  • Installation and Commissioning
  • Resource Management
  • Team Management
  • Cross-functional Coordination
  • Analytical Skills
  • Purchasing and planning
  • Cost analysis and savings
  • Root Cause Analysis
  • Electrical Preventive Maintenance
  • Troubleshooting

Accomplishments

  • Pyro circuit modification from 3600 TPD to 6000 TPD has been successfully completed.
  • The AFR Project (Pre-Processing and Co-Processing) has been successfully completed.
  • The erection, testing, and commissioning of 3x60 MW Jaypee Churk captive power plants, WTP & Compressor House have been successfully completed.
  • The cutting line has been successfully erected, commissioned, and tested.
  • The capacity modification of the Kiln and Preheater section has been successfully completed.
  • The problem in ACC MCC has been troubleshooted and rectified successfully.

Additional Information

18 Years

Passport Validity

07/05/24

Personal Information

  • Passport Number: L9446300
  • Date of Birth: 02/12/84

Timeline

Deputy Manager – Electrical Projects and Maintenance

Birla Corporation Limited, Unit Chanderia Cement Works
09.2018 - Current

Electrical Engineer-1 (Projects and Maintenance)

JAYPEE CHURK INUSTRIAL COMPLEX (A Unit of Jaiprakash Associates Ltd.)
01.2013 - 09.2018

Team Member (Electrical Project)

M/S SAINT GOBAIN GLASS INDIA LIMITED
05.2011 - 12.2012

Electrical Engineer (Maintenance)

BIRLA CEMENT WORKS
06.2005 - 05.2011

Science Education

Govt. Senior Secondary School,

Matriculation -

Govt. Sr. Sec. School

Engineering Diploma in Electrical Engineering -

Vidhya Bhawan Polytechnic College
NARENDRA KUMAR SAINI